POSOCO_Final_Logo

POWER SYSTEM OPERATION CORPORATION LIMITED

(A Government of India Enterprise) CIN: U40105DL2009GOI188682

National Load Despatch Centre

IMS-PolicyOHSAS-18001-2007
Login | Intranet | Mail
  • English
  • हिन्दी
  • Home
  • About Us
    • Annual Reports
    • Annual Return
    • Board of Directors
    • Resignation
    • Terms and conditions of appointment of independent directors
    • Code of Business Conduct and Ethics
      • Circular code
    • Document Retention Policy
    • Functions of NLDC
    • Mission & Objectives
    • Origin
    • The Organization
    • MoU
      • MoU 2021-22
      • MoU 2020-21
      • MoU 2019-20
      • MoU 2018-19
      • MoU 2017-18
    • CSR
    • Vision 2030
  • Market
    • Action under LPSC Rules, 2022
    • LPSC Procedure
    • MoP order: Optimization of use of power generated/allocation of Central Generating Station
    • Procedure for Charging Altered (including modified/replaced/upgraded) Elements
    • First Time Charging Procedure for Power system Elements
    • Ancillary Services
    • REC
    • NOAR
    • DSM Rates
    • PAT Scheme
    • Registered Traders
    • Congestion Formats
      • Warning Notice (Format III)
      • Application of Charge Notice (Format IV)
      • Withdrawal Notice (Format V)
      • Statement of Congestion Charge (Format VI)
    • Congestion Monitoring
    • Market Information
    • Monthly ATC
      • Inter Country
      • Inter Regional
      • Intra Regional
    • Open Access
      • Bilateral
      • Collective
        • Day Ahead Market
        • Real Time Market
      • Documents – OA
      • STU Charges
    • TTC / ATC Declaration by CTU
    • Registration of trading licensee and Power Exchange
  • SCED
    • CERC Order
    • Detailed Procedure
    • Bank details
    • National SCED Settlement Statement
    • National SCED benefit sharing statement
    • National Statement of Compensation due to Part Load Operation on Account of SCED
    • Reconciliation
    • Interim Feedback Report Pilot on SCED
    • Detailed_Feedback_Report on SCED Pilot – Jan 2020
    • Detailed Feedback Report on SCED Pilot – Mar 2021
    • Detailed Feedback Report on SCED Pilot – Sep 2021
    • Detailed Feedback Report on SCED Pilot – Mar 2022
  • Renewable
    • RE Framework Procedures
    • RE Curtailments
  • Reports
    • Ancillary Services
      • RRAS Provider Details
      • Monthly Report
      • RRAS Instruction Summary
      • Half Year Feedback to CERC
    • Daily Report
    • Weekly Report
    • Monthly Report
    • Quarterly Operational Feedback
    • Daily Frequency Profile
    • System Reliability Index
      • Daily
        • Angular Difference
        • VDI/TTC/ATC
      • Weekly
        • Angular Difference
        • VDI/TTC/ATC
      • Monthly
        • VDI/FDI/System Reliability
    • Monthly Grid Disturbances/Incidence
    • Telemetry Status
      • NRLDC
      • WRLDC
      • SRLDC
      • ERLDC
      • NERLDC
    • Payment Security Mechanism
      • Daily Reports
      • Weekly Reports
    • Technical Papers
    • Other Reports
      • Report: FRAS Pilot Project Experience and Feedback
      • Electricity Demand Pattern Analysis
      • Renewable Energy Certificate (REC) Mechanism
      • Five Minute Metering and Accounting in India
    • FRC
    • Green Day Ahead Market Monthly Data
  • Scheduling
    • New Scheduling
    • Old Scheduling
      • All India URS
      • Declared Capacity
      • Eligibility
      • Withdrawal Schedule
      • Bhutan Injection Profile
      • IR Withdrawal Schedule
      • Changes in the past
        • Stations
        • State
      • Implemented Schedule
        • Form A
        • Form B
        • Form C
        • Inter Sectoral Withdrawal
      • Loss
      • Open Access
        • Open Access – Approvals
        • Open Access – Schedules
      • Scheduling Application
    • Demand Forecast
  • Transmission Pricing
    • Notified Procedures
    • Downloads
    • Formats for Data Submission
    • POC Data
    • CERC Regulation
    • Transmission Losses
    • CERC Orders
    • Notification of Peak Block
    • Notification of Transmission Charges for the DICs
  • Publications
    • Public Reports
      • Use of weather information for secure, reliable and economic operation of Indian grid
      • Seasonality Analysis of Load Factor-Indian power system perspective
      • Solar Eclipse 21 June 2020_Analysis of its impact on the Indian Power System-A Report
      • Solar Eclipse of 21.06.20 Possible Effects and Preparation – A Report
      • Report on Flexibility Analysis of Thermal Generation for Renewable Integration in India
      • Report on Pan India Lights of Event (9 PM at 9 PM) on 5th April 2020
      • Solar Eclipse Analysis of its Impact on the Indian Power System – A Report
      • Solar Eclipse Indian Power System likely impacts and preparedness- A Report
    • Published Papers
    • Consultation Papers
    • Analysis of Ramping Capability
    • Hydro Committee Report
    • India Renewable Integration Study Report
    • Reference Document on Weather Portal
    • Spinning Reserves
    • Other Reports
    • Report on POSOCO Institution Building as Independent System Operator in India
    • Inertia Assessment in the Indian Power System
  • HR
    • HR website
    • HRD website
    • HRD Action Plan
    • Rajbhasha
    • Internship
    • POSOCO Power System Awards
    • Ex employee login
    • Legal
  • Useful Links
    • RLDC
      • NRLDC
      • WRLDC
      • SRLDC
      • NERLDC
      • ERLDC
    • Fold
    • PSDF
    • Vidyut Pravah
    • Ministry of Power
    • CERC
    • MNRE
    • Weather
    • E – Gazette
    • Finance Website
    • Vigilance
    • Disaster Management
    • Attendance Management
    • GO15
    • CVC PLEDGE
    • Weather Portal
  • Notice
  • Media
    • Photo / Video Gallery
  • Careers
    • Current Openings
    • Engagement of Apprentices
    • Candidate Downloads
  • Covid-19

September 15, 2020 by admin

Final Procedures for implementation of Sharing Regulations 2020

  • Procedure-for-computation-and-sharing-of-ISTS-Losses-Final
  • Procedure-for-collection-of-data-and-information-Final
  • Procedure-for-Computation-and-sharing-of-Transmission-charges-Final

Filed Under: Marquee News

  • Awards
  • Tenders
  • RTI
  • Citizens Charter
  • Compliance
  • Site Map
  • Feedback & Grievances
  • Contact Us
  • Facebook
  • LinkedIn
  • Twitter

NCW Women's HelpLine  - 7827170170

Power System Operation Corporation Limited

B-9 (1st Floor), Qutab Institutional Area, Katwaria Sarai, New Delhi -110016

Copyright ©2022 POSOCO | Last updated on: 20-08-2022

WordPress Download Manager - Best Download Management Plugin

Flasher
  • Extension of last date to 10th August of the Stakeholder consultation of draft procedure for Green Energy Open Access
  • Invitation for comments/ suggestions from the stakeholders and interested persons on the draft detailed Procedures for the implementation of REC Mechanism in Compliance to CERC (Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation) Regulations, 2022.
  • Invitation for comments/ suggestions from the stakeholders and interested persons on the draft detailed Procedures for the implementation of REC Mechanism in Compliance to CERC (Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation) Regulations, 2022.
  • Estimation of Reserves Requirement (Last date for comments extended till 15th July, 2022)
  • Public Stakeholder Consultation on Draft Detailed Procedure on Estimation of Reserves Requirement
  • Letter to stakeholders on implementation of NOAR 12 Apr 2022
  • Detailed Feedback Report on SCED Pilot – Mar 2022
  • Approval of modification of REC Procedures
  • Use of weather information for secure, reliable and economic operation of Indian grid
  • Report on Assessment of Inertia in Indian Power System
  • Participate and Contribute your rendering on ‘Desh Bhakti Geet writing’, ‘Lori writing’ & ‘Rangoli making’ organised by Ministry of Culture ‘Azadi ka Amrit Mahotsav’ (AKAM)
  • Commencement of Registration with National Open Access Registry (NOAR) platform for Open Access in Interstate Transmission System
  • MoP order: Optimization of use of power generated/allocation of Central Generating Station
  • Detailed Feedback Report on Extended SCED Pilot – Sep 2021
  • Voltage Control Ancillary Services
  • REPORT ON RENEWABLE ENERGY CURTAILMENT IN TAMIL NADU (For the period 01.03.2017 TO 30.06.2017)
  • HON’BLE APTEL order dated 02nd August 2021 in APPEAL NO.197/2019
  • Seasonality Analysis of Load Factor-Indian power system perspective
  • Notification regarding LDC Excellence award in ICPS 2021
  • Report on Pilot project – Five Minute Metering and Accounting in India
  • Report on POSOCO Institution Building as Independent System Operator in India
  • Revised detailed guidelines for assessment of ramping capability of ISGS
  • Stakeholder consultation for Amendment to Guidelines for Assessment of Ramping Capability
  • Final Procedures for implementation of Sharing Regulations 2020
  • POSOCO HRD Action Plan 2020-21
  • Compiled comments of stakeholders received on draft Procedures for implementation of Sharing Regulations 2020
  • Consolidated First Time Charging Procedure for New or Modified Power System Elements
  • Revised Procedure for Scheduling of Collective Transactions through RTM
  • Report on Flexibility Analysis of Thermal Generation for Renewable Integration in India
  • Draft_Communication Interface Requirements
Disclaimer

Precautions have been taken by National Load Dispatch Center (NLDC) to upload the data/information and the uploaded data/information is believed to be accurate, reliable and complete. However, before relying on the information material, users are advised to ensure its accuracy, currency, completeness and relevance for their purposes, and, in this respect, NLDC shall not be responsible for any errors or omissions. All information is provided without warranty of any kind.

NLDC disclaims all express, implied, and statutory warranties of any kind to user and/or any third party, including warranties as to accuracy, timeliness, completeness, merchantability, or fitness for any particular purpose. NLDC have no liability in tort, contract, or otherwise to user and/or third party. Further, NLDC shall, under no circumstances, be liable to user, and/or any third party, for any lost profits or lost opportunity, indirect, special, consequential, incidental, or punitive damages whatsoever, even if NLDC has been advised of the possibility of such damages.

By visiting this site, the users confirm about their awareness and agreement to this disclaimer and associated terms referred elsewhere.