POSOCO_Final_Logo

POWER SYSTEM OPERATION CORPORATION LIMITED

(A Government of India Enterprise) CIN: U40105DL2009GOI188682

National Load Despatch Centre

IMS-Policy-2019OHSAS-18001-2007
Login | Intranet | Mail
  • English
  • हिन्दी
  • Home
  • About Us
    • Annual Reports
    • Board of Directors
    • Chief Vigilance Officer (CVO)
    • Code of Business Conduct and Ethics
      • Circular Code
    • Document Retention Policy
    • Functions of NLDC
    • Mission & Objectives
    • Origin
    • The Organization
    • MoU
      • MoU 2020-21
      • MoU 2019-20
      • MoU 2018-19
      • MoU 2017-18
    • CSR
    • Photo / Video Gallery
  • Market
    • Ancillary Services
    • REC
    • DSM Rates
    • PAT Scheme
    • Registered Traders
    • Congestion Formats
      • Warning Notice (Format III)
      • Application of Charge Notice (Format IV)
      • Withdrawal Notice (Format V)
      • Statement of Congestion Charge (Format VI)
    • Congestion Monitoring
    • Market Information
    • Monthly ATC
      • Inter Country
      • Inter Regional
      • Intra Regional
    • Open Access
      • Bilateral
      • Collective
        • Day Ahead Market
        • Real Time Market
      • Documents
      • STU Charges
    • TTC / ATC Declaration by CTU
  • SCED
    • CERC Order
    • Detailed Procedure
    • Bank details
    • National SCED Settlement Statement
    • National SCED benefit sharing statement
    • National Statement of Compensation due to Part Load Operation on Account of SCED
    • Reconciliation
    • Interim Feedback Report of Pilot on SCED
    • Detailed Feedback Report on SCED Pilot – Jan 2020
    • Detailed Feedback Report on Expanded SCED Pilot – Mar 2021
  • Renewables
    • RE Framework Procedures
    • RE Curtailments
  • Reports
    • Ancillary Services
      • RRAS Providers Details
      • Monthly Reports
      • RRAS Instruction Summary
      • Half Year Feedback to CERC
    • FRAS Feedback Report
    • Daily Reports
    • Weekly Reports
    • Monthly Reports
    • Electricity Demand Pattern Analysis
    • Frequency Profile
    • System Reliability Indices
      • Daily
        • Angular Difference
        • VDI/TTC/ATC
      • Weekly
        • Angular Difference
        • VDI/TTC/ATC
      • Monthly
        • VDI/FDI/System Reliability
    • Grid Disturbances / Incidences
    • Telemetry Status
    • Payment Security Mechanism
      • Daily Reports
      • Weekly Reports
    • Renewable Energy Certificate(REC) Mechanism
    • Technical Papers
    • Five Minute Metering and Accounting in India
  • Scheduling
    • All India URS
    • Declared Capability
    • Entitlement
    • Drawal Schedule
    • Bhutan Injection Profile
    • IR Drawal Schedule
    • Changes in last revision
      • Stations
      • State
    • Implemented Schedule
      • Form A
      • Form B
      • Form c
      • IR Drawal
    • Losses
    • Open Access
      • Approvals
      • Schedules
    • Scheduling Application
  • Transmission Pricing
    • Notified Procedures
    • Downloads
    • Formats for Data Submission
    • POC Data
    • CERC Regulation
    • Transmission Losses
    • CERC Orders
    • Notification of Peak Block
    • Notification of Transmission Charges for the DICs
  • Publications
    • Published Reports
      • Solar Eclipse 21st June 2020_Analysis of its impact on Indian Power System-A Report
      • Solar Eclipse dated 21.06.20 likely impacts and preparedness – A report
      • Report on Flexibility Analysis of Thermal Generation for Renewable Integration in India
      • Report on Pan India Lights Off Event (9 PM 9 Minutes) on 5th April 2020
      • Solar Eclipse Analysis of its impact on Indian Power System – A report
      • Solar Eclipse Indian Power System likely impacts and preparedness- A Report
    • Operational Feedback
    • Published Papers
    • Consultation Papers
    • Analysis of Ramping Capability
    • Hydro Committee Report
    • India Renewable Integration Study Report
    • Reference Document on Weather Portal
    • Spinning Reserves
    • Other Reports
    • POSOCO Institution Building as ISO in India
  • HR
    • HR website
    • HRD
    • Rajbhasha
    • Internship
    • PPSA
    • Ex Employee Login
  • Useful Links
    • RLDCs
      • NRLDC
      • WRLDC
      • SRLDC
      • NERLDC
      • ERLDC
    • FOLD
    • PSDF
    • Vidyut Pravah
    • MoP
    • CERC
    • MNRE
    • Weather
    • E-Gazette
    • Finance Website
    • Vigilance
    • Disaster Management
    • Attendance Management
    • GO15
    • CVC PLEDGE
    • Weather Portal
  • Notices
  • Media
  • Careers
    • Openings (recruitment)
    • Engagement of Apprentices
    • Candidate Downloads
    • Notifications
  • COVID-19

careers

Important Guidelines
  • The application works best on Internet Explorer Version 11 or above, Mozilla Firefox Version 50 or above, Google Chrome Version 50 or above, Apple Safari Version 5 or above, Opera Version 15 or above.
  • Ensure that JavaScript is enabled in the browser.
  • Kindly do not use autocomplete to fill data.
  • Please fill the Application Form serially.
  • Do not use special characters like ',$,<,>,., etc.
  • In case a candidate submits more than 01 application, Application against which fee is paid will only be accepted. If application fee is not applicable or application fee is paid more than once then the application with the latest registration number shall only be considered.
  • Do not wait till last date to fill up the application or deposit application fees. Candidates are advised to apply well in time to avoid technical problems.
  • Print out of application should be taken only in Portrait.
  • The application system is not checking your eligibility while submission. Hence you are required to ensure your eligibility w.r.t. our detailed advertisement before applying. Mere submission of application will not guarantee the candidature for further selection process.
  • The online application can be filled from 10th October 2019 to 09th November 2019.
  • For detailed Advertisement Ref: Advt. No. CC/12/2019 Dated 23rd September 2019 Click Here.
  • For any queries, mail to posocohr@posoco.in
  • You will be asked OTP during Application Process please make sure to have Mobile phone handy.

Welcome to Online Recruitment System


****Application window has been Closed for Manager(HR) ****

  • Awards
  • Tenders
  • RTI
  • Compliance
  • Site Map
  • Feedback & Grievances
  • Contact Us
  • LinkedIn
  • Twitter

Power System Operation Corporation Limited

B-9 (1st Floor), Qutab Institutional Area, Katwaria Sarai, New Delhi -110016

Copyright ©2017 POSOCO

WordPress Download Manager - Best Download Management Plugin

Disclaimer

Precautions have been taken by National Load Dispatch Center (NLDC) to upload the data/information and the uploaded data/information is believed to be accurate, reliable and complete. However, before relying on the information material, users are advised to ensure its accuracy, currency, completeness and relevance for their purposes, and, in this respect, NLDC shall not be responsible for any errors or omissions. All information is provided without warranty of any kind.

NLDC disclaims all express, implied, and statutory warranties of any kind to user and/or any third party, including warranties as to accuracy, timeliness, completeness, merchantability, or fitness for any particular purpose. NLDC have no liability in tort, contract, or otherwise to user and/or third party. Further, NLDC shall, under no circumstances, be liable to user, and/or any third party, for any lost profits or lost opportunity, indirect, special, consequential, incidental, or punitive damages whatsoever, even if NLDC has been advised of the possibility of such damages.

By visiting this site, the users confirm about their awareness and agreement to this disclaimer and associated terms referred elsewhere.