National Load Despatch Center (NLDC) has been assigned with the responsibility to provide operation feedback for planning of the National Grid to the Central Electricity Authority and Central Transmission Utility as per clause 4(j) of NLDC Rules, 2005.
Clause 4(j) of NLDC rules: “Providing operational feedback for national grid planning to the Authority and Central Transmission Utility.”
Accordingly, quarterly feedback have been submitted by NLDC to the central planning agencies since April 2010.