IMS-PolicyOHSAS-18001-2007
Login | Intranet | Mail
  • English
  • हिन्दी
  • Home
  • About Us
    • Annual Reports
    • Annual Return
    • Board of Directors
    • Composition of Committees of Directors
    • Resignation
    • Terms and conditions of appointment of independent directors
    • Code of Business Conduct and Ethics
      • Circular code
    • Document Retention Policy
    • Functions of NLDC
    • Mission & Objectives
    • Origin
    • The Organization
    • MoU
      • MoU 2024-25
      • MoU 2023-24
      • MoU 2022-23
      • MoU 2021-22
      • MoU 2020-21
      • MoU 2019-20
      • MoU 2018-19
      • MoU 2017-18
    • CSR
    • Vision 2030
  • Market
    • MoP order: Optimization of use of power generated/allocation of Central Generating Station
    • Procedure for Charging Altered (including modified/replaced/upgraded) Elements
    • First Time Charging Procedure for Power system Elements
    • Ancillary Services
    • REC
    • NOAR
    • Deviation & Ancillary Service Pool Account status
    • Net Deviation & Ancillary Services Pool Account Deficit statement
    • DSM Rates
      • DSM Rate (Applicable up to 04.12.22)
      • Procedure for Normal Rate of Charges for Deviation
      • DSM Rate (Applicable from 05.12.22)
    • Carbon Market
      • CCTS Notification 2023
    • PAT Scheme
    • Registered Traders
    • Congestion Formats
      • Warning Notice (Format III)
      • Application of Charge Notice (Format IV)
      • Withdrawal Notice (Format V)
      • Statement of Congestion Charge (Format VI)
    • Congestion Monitoring
    • Market Information
    • Monthly ATC
      • Inter Country
      • Inter Regional
      • Intra Regional
    • Open Access
      • Bilateral
      • Collective
        • Day Ahead Market
        • Real Time Market
      • Documents – OA
      • STU Charges
    • TTC / ATC Declaration by CTU
    • Registration of trading licensee and Power Exchange
    • GOAR
    • Renewable
      • RE Framework Procedures
      • RE Curtailments
  • LPSC
    • Action under LPSC Rules, 2022
    • LPSC Procedure
    • Important Communications
  • URET
    • Electricity Amendment Rules_2022
    • Electricity Amendment Rules_2023
    • URET Procedures
    • URET Portal
  • SCED
    • CERC Order
    • Detailed Procedure
    • Bank details
    • National SCED Settlement Statement
    • National SCED Statement for MTL support
    • National SCED benefit sharing statement
    • National Statement of Compensation due to Part Load Operation on Account of SCED
    • Reconciliation
    • Interim Feedback Report Pilot on SCED
    • Detailed_Feedback_Report on SCED Pilot – Jan 2020
    • Detailed Feedback Report on SCED Pilot – Mar 2021
    • Detailed Feedback Report on SCED Pilot – Sep 2021
    • Detailed Feedback Report on SCED Pilot – Mar 2022
  • Reports
    • Daily PSP Report
    • Daily VRE Report
    • Weekly Report
    • Monthly Report
    • Quarterly Operational Feedback
    • Daily AS & SCUC Report
    • Daily Frequency Profile
    • System Reliability Index
      • Daily
        • Angular Difference
        • VDI/TTC/ATC
      • Weekly
        • Angular Difference
        • VDI/TTC/ATC
      • Monthly
        • VDI/FDI/System Reliability
    • Monthly Grid Disturbances/Incidence
    • Telemetry Status
      • NRLDC
      • WRLDC
      • SRLDC
      • ERLDC
      • NERLDC
    • Payment Security Mechanism
      • Daily Reports
      • Weekly Reports
      • Daily PSM Status
        • Interstate PSM Status
        • Intrastate PSM Status
    • Technical Papers
    • Other Reports
      • Reports on Performance and Experience of Long Duration Contracts Introduced in Power Exchanges – I_January 2023
      • Reports on Performance and Experience of Long Duration Contracts Introduced in Power Exchanges – II_December 2023
      • Report: FRAS Pilot Project Experience and Feedback
      • Electricity Demand Pattern Analysis
      • Renewable Energy Certificate (REC) Mechanism
      • Five Minute Metering and Accounting in India
    • Primary Response
    • Green Day Ahead Market Monthly Data
  • Scheduling
    • SCUC
    • SCED_MTL
      • 1500 hrs of D-1 – List of plants scheduled below MTL
      • 2030 hrs of D-1 – List of plants supported by SCED_MTL
    • New Scheduling
    • Old Scheduling
      • All India URS
      • Declared Capacity
      • Eligibility
      • Withdrawal Schedule
      • Bhutan Injection Profile
      • IR Withdrawal Schedule
      • Changes in the past
        • Stations
        • State
      • Implemented Schedule
        • Form A
        • Form B
        • Form C
        • Inter Sectoral Withdrawal
      • Loss
      • Open Access
        • Open Access – Approvals
        • Open Access – Schedules
      • Scheduling Application
    • Demand Forecast
      • Forecast
      • Forecast Error
        • Daily/Intra-Day
        • Weekly
        • Monthly
        • Yearly
    • Additional Resource Requirement
  • Transmission Pricing
    • Notified Procedures
    • Downloads
    • Formats for Data Submission
    • POC Data
    • CERC Regulation
    • Transmission Losses
    • CERC Orders
    • Notification of Peak Block
    • Notification of Transmission Charges for the DICs
  • Ancillary Services
    • Regulations
      • Ancillary Services Regulations, 2022
      • Statement of Reasons
    • Orders
      • October – 2022
      • February – 2023
      • March – 2023
      • April – 2023
    • Procedures
      • Assessment of Reserves – Sep 2023
        • Frequency Bias Coefficient
      • Detailed Procedure for Secondary Reserve Ancillary Services (SRAS) – Dec 2022
      • Detailed Procedure for Tertiary Reserve Ancillary Services (TRAS) – April 2023
    • Reference Contingency
    • Reserve Requirement
      • Day Ahead and Real Time
      • Year Ahead
    • SRAS
      • SRAS Providers Details
    • TRAS
      • TRAS Provider Login
      • TRAS Provider Details (Thermal)
      • TRAS Provider Details (Gas)
    • Reports
      • TRAS/SRAS Monthly Reports
    • Ancillary Services Archives
      • Old Quarter Ahead
        • Q1 (FY 2023-24)
        • Q2 (FY 2023-24)
      • Old RRAS Data
        • RRAS Provider Details
        • Monthly Report
        • RRAS Instruction Summary
        • Half Year Feedback to CERC
      • Other Documents
        • Spinning Reserves
  • Publications
    • NLDC Procedures
    • Public Reports
      • Report on high frequency operation for 4th , 11th and 25th Aug 2024
      • CIGRE Grid-India Capacity Building Workshop on “RE Modelling and Forecasting”
      • Demand Pattern Analysis Report
      • Report-on-Events-Involving-Transmission-Grid-Connected-Wind-Solar-Plants
      • Seasonality Analysis of Load Factor-Indian power system perspective
      • Solar Eclipse 21 June 2020_Analysis of its impact on the Indian Power System-A Report
      • Solar Eclipse of 21.06.20 Possible Effects and Preparation – A Report
      • Report on Flexibility Analysis of Thermal Generation for Renewable Integration in India
      • Report on Pan India Lights of Event (9 PM at 9 PM) on 5th April 2020
      • Solar Eclipse Analysis of its Impact on the Indian Power System – A Report
      • Solar Eclipse Indian Power System likely impacts and preparedness- A Report
    • Published Papers
    • Consultation Papers
    • Analysis of Ramping Capability
    • Hydro Committee Report
    • India Renewable Integration Study Report
    • Reference Document on Weather Portal
    • Other Reports
      • Cyber Security Symposium
      • Covid-19
    • Inertia Assessment in the Indian Power System
    • Short-Term National Resource Adequacy Plan 2025-26
    • R&D Projects
    • System Operation Documents
  • HR
    • HR website
    • HRD website
    • Jigyasa eLearning Portal
    • HRD Action Plan
    • Rajbhasha
    • Internship
    • GRID-INDIA Power System Awards
    • Ex employee login
    • Legal
  • Useful Links
    • RLDC
      • NRLDC
      • WRLDC
      • SRLDC
      • NERLDC
      • ERLDC
    • CEA
    • RPCs
      • NRPC
      • ERPC
      • SRPC
      • WRPC
      • NERPC
    • Fold
    • PSDF
    • Vidyut Pravah
    • Ministry of Power
    • CERC
    • MNRE
    • Weather
    • E – Gazette
    • Finance Website
    • Vigilance
    • Disaster Management
    • Attendance Management
    • Property Return System
    • GO15
    • CVC PLEDGE
    • Weather Portal
  • Notice
  • Media
    • Photo / Video Gallery
  • Careers
    • Current Openings
    • Backlog Vacancies
    • Engagement of Apprentices
    • Candidate Downloads

June 10, 2022 by Saif Rehman

Weekly 300522 to 050622


Download132
Stock∞
File Size816.85 KB
Create DateFriday June 10th, 2022
Download
  • Awards
  • Tenders
  • RTI
  • Citizens Charter
  • Compliance
  • Site Map
  • Feedback & Grievances
  • Contact Us
  • Facebook
  • LinkedIn
  • Twitter

NCW Women's HelpLine  - 7827170170

Grid Controller of India limited

B-9 (1st Floor), Qutab Institutional Area, Katwaria Sarai, New Delhi -110016

Copyright ©2024 GRID-INDIA | Last updated on: 09-05-2025

WordPress Download Manager - Best Download Management Plugin

Flasher
  • Suggestions on increasing the frequency of REC auction sessions at Power Exchanges
  • The mock trial period for operationalisation of Section F of LPSC Procedure is extended up to 30.06.2025
  • Assessment of Frequency Response Obligation (FRO) of control areas under RLDC jurisdiction for FY 2025-26
  • NLDC: Revision of Instalment amounts for NLDC Statement for Legacy dues dated 11.11.2024
  • Submitted to CERC draft Detailed procedure for moderating schedule up to minimum turndown level for Section 62 generators through SCED
  • DSM_Pool_Recovery_Statement_dated_13.01.2025
  • Draft Detailed procedure for moderating schedule up to minimum turndown level for Section 62 generators through SCED
  • Extension of mock run period for Implementation of Section F of LPSC Procedure
  • Revised Procedure for Implementation of LPSC Rules 2022 and amendment thereof dated 25th November 2024
  • NLDC Advisory IEGC (First Amendment) Regulations, 2024
  • CERC approved Methodology for computation of Average Monthly Frequency Response Performance, Beta ‘ß’
  • Detailed Procedure for recovery of charges in case of deficit in the Deviation and Ancillary Service Pool Account
  • Draft Procedure for Part load compensation_30-09-24_annex_CERC
  • Report on high frequency operation for 4th , 11th and 25th Aug 2024
  • NLDC Operating Procedure 2024
  • Procedure to facilitate scheduling and accounting of Free Power from bus bar of generating station.
  • Transition to New WBES from existing WBES w.e.f. 05.08.2024
  • Procedure for Implementation of LPSC Rules 2022 and amendment thereof
  • CERC-final-order-in-BESS-P-No-249-MP-2023
  • Approved Procedure for Scheduling, Metering, Accounting and Settlement for Ancillary portion (150MW/300MWh) of BESS (Pilot) Project
  • (हिन्दी) Stakeholder consultation on draft LPSC procedure
  • Modified Detailed Procedure for Implementation of REC Mechanism In Compliance of CERC REC Regulations 2022 (Revision-3) effective from 01.04.2024
  • GRID-INDIA Anthem
  • GRID-INDIA Corporate Film
  • Demand Pattern Analysis Report
  • Grid-India report on “Events involving transmission grid connected wind and solar power plants”
  • Webinar Series on Challenges and Way Forward for Reliable Operation of Power Systems with High Penetration of Variable Renewable Energy in the Indian Grid
  • Quantum of GNAsh and GNAd as per CERC(Connectivity and General Network Access to the inter-State Transmission System)(First Amendment) Regulations,2023
  • Detailed Procedure for Tertiary Reserve Ancillary Services (TRAS)
  • “ Seeking comments/suggestions of stakeholders on draft Procedures for implementation of CERC Sharing Regulations (First Amendment) 2023 Last date for Comments extended till 04th April, 2023”
  • CERC Directions in the interest of grid security, in pursuance of the provisions of the Electricity Act, 2003 and the provisions DSM Regulations, 2022
  • Detailed Procedure for Estimation of the Requirement of Secondary Reserve Ancillary Service (SRAS) and Tertiary Reserve Ancillary Service (TRAS) at Regional Level
  • Awardees of POSOCO Power System Awards (PPSA)-2023- Click here!
Disclaimer

Download0
Stock∞
File Size
Create DateTuesday December 13th, 2022
Download