G20 2023 logo     
IMS-PolicyOHSAS-18001-2007
Login | Intranet | Mail
  • English
  • हिन्दी
  • Home
  • About Us
    • Annual Reports
    • Annual Return
    • Board of Directors
    • Resignation
    • Terms and conditions of appointment of independent directors
    • Code of Business Conduct and Ethics
      • Circular code
    • Document Retention Policy
    • Functions of NLDC
    • Mission & Objectives
    • Origin
    • The Organization
    • MoU
      • MoU 2021-22
      • MoU 2020-21
      • MoU 2019-20
      • MoU 2018-19
      • MoU 2017-18
    • CSR
    • Vision 2030
  • Market
    • MoP order: Optimization of use of power generated/allocation of Central Generating Station
    • Procedure for Charging Altered (including modified/replaced/upgraded) Elements
    • First Time Charging Procedure for Power system Elements
    • Ancillary Services
    • REC
    • NOAR
    • DSM Rates
      • DSM Rate (Applicable up to 04.12.22)
      • Procedure for Normal Rate of Charges for Deviation
      • DSM Rate (Applicable from 05.12.22)
    • PAT Scheme
    • Registered Traders
    • Congestion Formats
      • Warning Notice (Format III)
      • Application of Charge Notice (Format IV)
      • Withdrawal Notice (Format V)
      • Statement of Congestion Charge (Format VI)
    • Congestion Monitoring
    • Market Information
    • Monthly ATC
      • Inter Country
      • Inter Regional
      • Intra Regional
    • Open Access
      • Bilateral
      • Collective
        • Day Ahead Market
        • Real Time Market
      • Documents – OA
      • STU Charges
    • TTC / ATC Declaration by CTU
    • Registration of trading licensee and Power Exchange
    • GOAR
  • LPSC
    • Action under LPSC Rules, 2022
    • LPSC Procedure
    • Important Communications
  • SCED
    • CERC Order
    • Detailed Procedure
    • Bank details
    • National SCED Settlement Statement
    • National SCED benefit sharing statement
    • National Statement of Compensation due to Part Load Operation on Account of SCED
    • Reconciliation
    • Interim Feedback Report Pilot on SCED
    • Detailed_Feedback_Report on SCED Pilot – Jan 2020
    • Detailed Feedback Report on SCED Pilot – Mar 2021
    • Detailed Feedback Report on SCED Pilot – Sep 2021
    • Detailed Feedback Report on SCED Pilot – Mar 2022
  • Renewable
    • RE Framework Procedures
    • RE Curtailments
  • Reports
    • Ancillary Services
      • RRAS Provider Details
      • Monthly Report
      • RRAS Instruction Summary
      • Half Year Feedback to CERC
    • Daily Report
    • Weekly Report
    • Monthly Report
    • Quarterly Operational Feedback
    • Daily Frequency Profile
    • System Reliability Index
      • Daily
        • Angular Difference
        • VDI/TTC/ATC
      • Weekly
        • Angular Difference
        • VDI/TTC/ATC
      • Monthly
        • VDI/FDI/System Reliability
    • Monthly Grid Disturbances/Incidence
    • Telemetry Status
      • NRLDC
      • WRLDC
      • SRLDC
      • ERLDC
      • NERLDC
    • Payment Security Mechanism
      • Daily Reports
      • Weekly Reports
      • Daily PSM Status
        • Interstate PSM Status
        • Intrastate PSM Status
    • Technical Papers
    • Other Reports
      • Report: FRAS Pilot Project Experience and Feedback
      • Electricity Demand Pattern Analysis
      • Renewable Energy Certificate (REC) Mechanism
      • Five Minute Metering and Accounting in India
    • FRC
    • Green Day Ahead Market Monthly Data
  • Scheduling
    • New Scheduling
    • Old Scheduling
      • All India URS
      • Declared Capacity
      • Eligibility
      • Withdrawal Schedule
      • Bhutan Injection Profile
      • IR Withdrawal Schedule
      • Changes in the past
        • Stations
        • State
      • Implemented Schedule
        • Form A
        • Form B
        • Form C
        • Inter Sectoral Withdrawal
      • Loss
      • Open Access
        • Open Access – Approvals
        • Open Access – Schedules
      • Scheduling Application
    • Demand Forecast
  • Transmission Pricing
    • Notified Procedures
    • Downloads
    • Formats for Data Submission
    • POC Data
    • CERC Regulation
    • Transmission Losses
    • CERC Orders
    • Notification of Peak Block
    • Notification of Transmission Charges for the DICs
  • Publications
    • Public Reports
      • Seasonality Analysis of Load Factor-Indian power system perspective
      • Solar Eclipse 21 June 2020_Analysis of its impact on the Indian Power System-A Report
      • Solar Eclipse of 21.06.20 Possible Effects and Preparation – A Report
      • Report on Flexibility Analysis of Thermal Generation for Renewable Integration in India
      • Report on Pan India Lights of Event (9 PM at 9 PM) on 5th April 2020
      • Solar Eclipse Analysis of its Impact on the Indian Power System – A Report
      • Solar Eclipse Indian Power System likely impacts and preparedness- A Report
    • Published Papers
    • Consultation Papers
    • Analysis of Ramping Capability
    • Hydro Committee Report
    • India Renewable Integration Study Report
    • Reference Document on Weather Portal
    • Spinning Reserves
    • Other Reports
    • Inertia Assessment in the Indian Power System
  • HR
    • HR website
    • HRD website
    • Jigyasa eLearning Portal
    • HRD Action Plan
    • Rajbhasha
    • Internship
    • POSOCO Power System Awards
    • Ex employee login
    • Legal
  • Useful Links
    • RLDC
      • NRLDC
      • WRLDC
      • SRLDC
      • NERLDC
      • ERLDC
    • Fold
    • PSDF
    • Vidyut Pravah
    • Ministry of Power
    • CERC
    • MNRE
    • Weather
    • E – Gazette
    • Finance Website
    • Vigilance
    • Disaster Management
    • Attendance Management
    • Property Return System
    • GO15
    • CVC PLEDGE
    • Weather Portal
  • Notice
  • Media
    • Photo / Video Gallery
  • Careers
    • Current Openings
    • Engagement of Apprentices
    • Candidate Downloads
  • Covid-19

Statement of Congestion Charge (Format VI)

Title File Size File Date
Covering_letter_Sys_reliability_FDI_VDI_December_2021 1.27 MB 05-01-2022
Frequency 17.12.21 1,002.00 KB 18-12-2021
06.10.21_NLDC_PSP 300.13 KB 07-10-2021
20.09.21_NLDC_PSP 1.22 MB 21-09-2021
All India Angular Spread_030821 227.48 KB 18-09-2021
Frequency 27.03.21 589.98 KB 28-03-2021
System Reliability Indices for 16.02.21 57.55 KB 17-02-2021
15.01.21_NLDC_PSP 1.36 MB 16-01-2021
TTC-ATC REVISION in SR Import w.e.f. from 2300 hrs for 20.11.2020 175.76 KB 20-11-2020
TTC-ATC REVISION in SR Import w.e.f. from 2300 hrs for 20.11.2020 175.76 KB 20-11-2020
TTC-ATC REVISION in WR-NR & NR Import w.e.f. from 1100 hrs for 18.11.2020 170.22 KB 18-11-2020
TTC-ATC Revision in WR-SR ,ER-SR & SR import w.e.f. 0000 Hrs of 10.11.2020.pdf 62.58 KB 10-11-2020
21.06.20_NLDC_PSP 1.17 MB 21-06-2020
TTC-ATC revision in ER-NR, WR-NR & NR import w.e.f. 00.00 Hrs of 18.05.2020 1.27 MB 18-05-2020
Frequency 05.03.20 963.95 KB 06-03-2020
Frequency 26.02.20 768.03 KB 27-02-2020
TTC_ATC Revision_WR-NR & NR IMPORT wef 2145hrs_16.12.19 144.82 KB 16-12-2019
All-India_Angular_spread_301019 137.00 KB 31-10-2019
26.08.19_NLDC_PSP 1.46 MB 26-08-2019
Weekly 270818 to 020918 1.14 MB 07-09-2018
Congestion_format_VI_01.08.17 250.96 KB 02-08-2017
Congestion_format_VI_19.07.17 244.74 KB 20-07-2017
Congestion_format_VI_18.07.17 242.20 KB 19-07-2017
Congestion_format_VI_09.01.17 199.85 KB 10-01-2017
Congestion_format_VI_14.12.16 197.25 KB 16-12-2016
Congestion_format_VI_16.09.16_Rev1 214.33 KB 27-09-2016
Congestion_format_VI_16.09.16 207.96 KB 23-09-2016
congestion format VI_23.07.11@0052 hrs 49.44 KB 13-07-2016
congestion format VI 22.07.11@0147 hrs 49.53 KB 13-07-2016
congestion format VI 17 08.12@00415 hrs 163.89 KB 13-07-2016
Congestion_format_VI_14 12.93 KB 03-03-2016
Congestion_format_VI_13 210.47 KB 03-03-2016
Congestion_format_VI_18 286.09 KB 22-09-2015
Congestion_format_VI_10 14.80 KB 11-08-2015
Congestion_format_VI_19 9.92 KB 22-06-2015
Congestion_format_VI_18 7.89 KB 19-06-2015
Congestion_format_VI_17 191.21 KB 18-06-2015
Congestion_format_VI_06 118.52 KB 08-06-2015
Congestion_format_VI_05 128.08 KB 08-06-2015
Congestion_format_VI_04 111.14 KB 08-06-2015
Congestion_format_VI_02 106.54 KB 03-06-2015
Congestion_format_VI_13 87.34 KB 03-03-2015
Congestion_format_VI_26 99.65 KB 27-02-2015
Congestion_format_VI_25 100.30 KB 27-02-2015
Congestion_format_VI_25 101.50 KB 27-02-2015
congestion format_VI_30 103.14 KB 01-09-2014
congestion format_VI_26 92.16 KB 26-08-2014
congestion format_VI_14 98.41 KB 21-08-2014
congestionformat_VI_15 90.28 KB 22-07-2014
congestionformat_VI_12 106.53 KB 22-07-2014
Congestion Format VI_11 98.50 KB 13-06-2013
Congestion Format VI _06 83.66 KB 13-06-2013
congestio_format VI_27 49.90 KB 12-03-2013
congestio_format VI_26 49.88 KB 12-03-2013
  • Awards
  • Tenders
  • RTI
  • Citizens Charter
  • Compliance
  • Site Map
  • Feedback & Grievances
  • Contact Us
  • Facebook
  • LinkedIn
  • Twitter

NCW Women's HelpLine  - 7827170170

Grid Controller of India limited

B-9 (1st Floor), Qutab Institutional Area, Katwaria Sarai, New Delhi -110016

Copyright ©2022 GRID-INDIA | Last updated on: 27-01-2023

WordPress Download Manager - Best Download Management Plugin

Flasher
  • GRID-INDIA invites comments/suggestions on the issue of increasing the frequency of REC (Renewable Energy Certificates) trading sessions on Power Exchanges from once in a month to once in a week.
  • CERC Directions in the interest of grid security, in pursuance of the provisions of the Electricity Act, 2003 and the provisions DSM Regulations, 2022
  • Detailed Procedure for Estimation of the Requirement of Secondary Reserve Ancillary Service (SRAS) and Tertiary Reserve Ancillary Service (TRAS) at Regional Level
  • Awardees of POSOCO Power System Awards (PPSA)-2023- Click here!
  • Extension of Last Date to 18th Dec 2022 for Stakeholder Feedback on Draft Procedure for Allocation of Transmission Corridor for GNA and T-GNA Transactions
  • Extension of Last Date to 9th Dec 2022 for Stakeholder Consultation on Draft Procedure for Allocation of Transmission Corridor for GNA and T-GNA Transactions
  • Public Consultation – Draft Procedure on Allocation of Transmission Corridor for Scheduling of GNA and T-GNA Transactions
  • Detailed-Procedures-for-implementation-of-REC-Mechanism-in-compliance-of-CERC_REC_Regulation-2022
Disclaimer

Precautions have been taken by National Load Dispatch Center (NLDC) to upload the data/information and the uploaded data/information is believed to be accurate, reliable and complete. However, before relying on the information material, users are advised to ensure its accuracy, currency, completeness and relevance for their purposes, and, in this respect, NLDC shall not be responsible for any errors or omissions. All information is provided without warranty of any kind.

NLDC disclaims all express, implied, and statutory warranties of any kind to user and/or any third party, including warranties as to accuracy, timeliness, completeness, merchantability, or fitness for any particular purpose. NLDC have no liability in tort, contract, or otherwise to user and/or third party. Further, NLDC shall, under no circumstances, be liable to user, and/or any third party, for any lost profits or lost opportunity, indirect, special, consequential, incidental, or punitive damages whatsoever, even if NLDC has been advised of the possibility of such damages.

By visiting this site, the users confirm about their awareness and agreement to this disclaimer and associated terms referred elsewhere.