POSOCO_Final_Logo

POWER SYSTEM OPERATION CORPORATION LIMITED

(A Government of India Enterprise) CIN: U40105DL2009GOI188682

National Load Despatch Centre

IMS-Policy-2019OHSAS-18001-2007
Login | Intranet | Mail
  • English
  • हिन्दी
  • Home
  • About Us
    • Annual Reports
    • Board of Directors
    • Chief Vigilance Officer (CVO)
    • Code of Business Conduct and Ethics
      • Circular Code
    • Document Retention Policy
    • Functions of NLDC
    • Mission & Objectives
    • Origin
    • The Organization
    • MoU
      • MoU 2020-21
      • MoU 2019-20
      • MoU 2018-19
      • MoU 2017-18
    • CSR
    • Photo / Video Gallery
  • Market
    • Ancillary Services
    • REC
    • DSM Rates
    • PAT Scheme
    • Registered Traders
    • Congestion Formats
      • Warning Notice (Format III)
      • Application of Charge Notice (Format IV)
      • Withdrawal Notice (Format V)
      • Statement of Congestion Charge (Format VI)
    • Congestion Monitoring
    • Market Information
    • Monthly ATC
      • Inter Country
      • Inter Regional
      • Intra Regional
    • Open Access
      • Bilateral
      • Collective
        • Day Ahead Market
        • Real Time Market
      • Documents
      • STU Charges
    • TTC / ATC Declaration by CTU
  • SCED
    • CERC Order
    • Detailed Procedure
    • Bank details
    • National SCED Settlement Statement
    • National SCED benefit sharing statement
    • National Statement of Compensation due to Part Load Operation on Account of SCED
    • Reconciliation
    • Interim Feedback Report of Pilot on SCED
    • Detailed Feedback Report on SCED Pilot – Jan 2020
    • Detailed Feedback Report on Expanded SCED Pilot – Mar 2021
  • Renewables
    • RE Framework Procedures
    • RE Curtailments
  • Reports
    • Ancillary Services
      • RRAS Providers Details
      • Monthly Reports
      • RRAS Instruction Summary
      • Half Year Feedback to CERC
    • FRAS Feedback Report
    • Daily Reports
    • Weekly Reports
    • Monthly Reports
    • Electricity Demand Pattern Analysis
    • Frequency Profile
    • System Reliability Indices
      • Daily
        • Angular Difference
        • VDI/TTC/ATC
      • Weekly
        • Angular Difference
        • VDI/TTC/ATC
      • Monthly
        • VDI/FDI/System Reliability
    • Grid Disturbances / Incidences
    • Telemetry Status
    • Payment Security Mechanism
      • Daily Reports
      • Weekly Reports
    • Renewable Energy Certificate(REC) Mechanism
    • Technical Papers
    • Five Minute Metering and Accounting in India
  • Scheduling
    • All India URS
    • Declared Capability
    • Entitlement
    • Drawal Schedule
    • Bhutan Injection Profile
    • IR Drawal Schedule
    • Changes in last revision
      • Stations
      • State
    • Implemented Schedule
      • Form A
      • Form B
      • Form c
      • IR Drawal
    • Losses
    • Open Access
      • Approvals
      • Schedules
    • Scheduling Application
  • Transmission Pricing
    • Notified Procedures
    • Downloads
    • Formats for Data Submission
    • POC Data
    • CERC Regulation
    • Transmission Losses
    • CERC Orders
    • Notification of Peak Block
    • Notification of Transmission Charges for the DICs
  • Publications
    • Published Reports
      • Solar Eclipse 21st June 2020_Analysis of its impact on Indian Power System-A Report
      • Solar Eclipse dated 21.06.20 likely impacts and preparedness – A report
      • Report on Flexibility Analysis of Thermal Generation for Renewable Integration in India
      • Report on Pan India Lights Off Event (9 PM 9 Minutes) on 5th April 2020
      • Solar Eclipse Analysis of its impact on Indian Power System – A report
      • Solar Eclipse Indian Power System likely impacts and preparedness- A Report
    • Operational Feedback
    • Published Papers
    • Consultation Papers
    • Analysis of Ramping Capability
    • Hydro Committee Report
    • India Renewable Integration Study Report
    • Reference Document on Weather Portal
    • Spinning Reserves
    • Other Reports
    • POSOCO Institution Building as ISO in India
  • HR
    • HR website
    • HRD
    • Rajbhasha
    • Internship
    • PPSA
    • Ex Employee Login
  • Useful Links
    • RLDCs
      • NRLDC
      • WRLDC
      • SRLDC
      • NERLDC
      • ERLDC
    • FOLD
    • PSDF
    • Vidyut Pravah
    • MoP
    • CERC
    • MNRE
    • Weather
    • E-Gazette
    • Finance Website
    • Vigilance
    • Disaster Management
    • Attendance Management
    • GO15
    • CVC PLEDGE
    • Weather Portal
  • Notices
  • Media
  • Careers
    • Openings (recruitment)
    • Engagement of Apprentices
    • Candidate Downloads
    • Notifications
  • COVID-19

Statement of Congestion Charge (Format VI)

Title File Size File Date
Frequency 27.03.21 589.98 KB 28-03-2021
System Reliability Indices for 16.02.21 57.55 KB 17-02-2021
15.01.21_NLDC_PSP 1.36 MB 16-01-2021
TTC-ATC REVISION in SR Import w.e.f. from 2300 hrs for 20.11.2020 175.76 KB 20-11-2020
TTC-ATC REVISION in SR Import w.e.f. from 2300 hrs for 20.11.2020 175.76 KB 20-11-2020
TTC-ATC REVISION in WR-NR & NR Import w.e.f. from 1100 hrs for 18.11.2020 170.22 KB 18-11-2020
TTC-ATC Revision in WR-SR ,ER-SR & SR import w.e.f. 0000 Hrs of 10.11.2020.pdf 62.58 KB 10-11-2020
21.06.20_NLDC_PSP 1.17 MB 21-06-2020
TTC-ATC revision in ER-NR, WR-NR & NR import w.e.f. 00.00 Hrs of 18.05.2020 1.27 MB 18-05-2020
Frequency 05.03.20 963.95 KB 06-03-2020
Frequency 26.02.20 768.03 KB 27-02-2020
TTC_ATC Revision_WR-NR & NR IMPORT wef 2145hrs_16.12.19 144.82 KB 16-12-2019
All-India_Angular_spread_301019 137.00 KB 31-10-2019
26.08.19_NLDC_PSP 1.46 MB 26-08-2019
Weekly 270818 to 020918 1.14 MB 07-09-2018
Congestion_format_VI_01.08.17 250.96 KB 02-08-2017
Congestion_format_VI_19.07.17 244.74 KB 20-07-2017
Congestion_format_VI_18.07.17 242.20 KB 19-07-2017
Congestion_format_VI_09.01.17 199.85 KB 10-01-2017
Congestion_format_VI_14.12.16 197.25 KB 16-12-2016
Congestion_format_VI_16.09.16_Rev1 214.33 KB 27-09-2016
Congestion_format_VI_16.09.16 207.96 KB 23-09-2016
congestion format VI_23.07.11@0052 hrs 49.44 KB 13-07-2016
congestion format VI 22.07.11@0147 hrs 49.53 KB 13-07-2016
congestion format VI 17 08.12@00415 hrs 163.89 KB 13-07-2016
Congestion_format_VI_14 12.93 KB 03-03-2016
Congestion_format_VI_13 210.47 KB 03-03-2016
Congestion_format_VI_18 286.09 KB 22-09-2015
Congestion_format_VI_10 14.80 KB 11-08-2015
Congestion_format_VI_19 9.92 KB 22-06-2015
Congestion_format_VI_18 7.89 KB 19-06-2015
Congestion_format_VI_17 191.21 KB 18-06-2015
Congestion_format_VI_06 118.52 KB 08-06-2015
Congestion_format_VI_05 128.08 KB 08-06-2015
Congestion_format_VI_04 111.14 KB 08-06-2015
Congestion_format_VI_02 106.54 KB 03-06-2015
Congestion_format_VI_13 87.34 KB 03-03-2015
Congestion_format_VI_26 99.65 KB 27-02-2015
Congestion_format_VI_25 100.30 KB 27-02-2015
Congestion_format_VI_25 101.50 KB 27-02-2015
congestion format_VI_30 103.14 KB 01-09-2014
congestion format_VI_26 92.16 KB 26-08-2014
congestion format_VI_14 98.41 KB 21-08-2014
congestionformat_VI_15 90.28 KB 22-07-2014
congestionformat_VI_12 106.53 KB 22-07-2014
Congestion Format VI_11 98.50 KB 13-06-2013
Congestion Format VI _06 83.66 KB 13-06-2013
congestio_format VI_27 49.90 KB 12-03-2013
congestio_format VI_26 49.88 KB 12-03-2013
  • Awards
  • Tenders
  • RTI
  • Compliance
  • Site Map
  • Feedback & Grievances
  • Contact Us
  • LinkedIn
  • Twitter

Power System Operation Corporation Limited

B-9 (1st Floor), Qutab Institutional Area, Katwaria Sarai, New Delhi -110016

Copyright ©2017 POSOCO

WordPress Download Manager - Best Download Management Plugin

Disclaimer

Precautions have been taken by National Load Dispatch Center (NLDC) to upload the data/information and the uploaded data/information is believed to be accurate, reliable and complete. However, before relying on the information material, users are advised to ensure its accuracy, currency, completeness and relevance for their purposes, and, in this respect, NLDC shall not be responsible for any errors or omissions. All information is provided without warranty of any kind.

NLDC disclaims all express, implied, and statutory warranties of any kind to user and/or any third party, including warranties as to accuracy, timeliness, completeness, merchantability, or fitness for any particular purpose. NLDC have no liability in tort, contract, or otherwise to user and/or third party. Further, NLDC shall, under no circumstances, be liable to user, and/or any third party, for any lost profits or lost opportunity, indirect, special, consequential, incidental, or punitive damages whatsoever, even if NLDC has been advised of the possibility of such damages.

By visiting this site, the users confirm about their awareness and agreement to this disclaimer and associated terms referred elsewhere.