POSOCO_Final_Logo

POWER SYSTEM OPERATION CORPORATION LIMITED

(A Government of India Enterprise) CIN: U40105DL2009GOI188682

National Load Despatch Centre

IMS-Policy-2019OHSAS-18001-2007
Login | Intranet | Mail
  • English
  • हिन्दी
  • Home
  • About Us
    • Annual Reports
    • Board of Directors
    • Chief Vigilance Officer (CVO)
    • Code of Business Conduct and Ethics
      • Circular Code
    • Document Retention Policy
    • Functions of NLDC
    • Mission & Objectives
    • Origin
    • The Organization
    • MoU
      • MoU 2019-20
      • MoU 2018-19
      • MoU 2017-18
      • Corporate Plan
    • CSR
    • Photo / Video Gallery
  • Market
    • Ancillary Services
    • REC
    • DSM Rates
    • PAT Scheme
    • Registered Traders
    • Congestion Formats
      • Warning Notice (Format III)
      • Application of Charge Notice (Format IV)
      • Withdrawal Notice (Format V)
      • Statement of Congestion Charge (Format VI)
    • Congestion Monitoring
    • Market Information
    • Monthly ATC
      • Inter Country
      • Inter Regional
      • Intra Regional
    • Open Access
      • Bilateral
      • Collective
        • Day Ahead Market
        • Real Time Market
      • Documents
      • STU Charges
    • TTC / ATC Declaration by CTU
  • SCED
    • CERC Order
    • Detailed Procedure
    • Bank details
    • National SCED Settlement Statement
    • National SCED benefit sharing statement
    • National Statement of Compensation due to Part Load Operation on Account of SCED
    • Reconciliation
    • Interim Feedback Report of Pilot on SCED
    • Detailed Feedback Report on SCED Pilot – Jan 2020
  • Renewables
    • RE Framework Procedures
    • RE Curtailments
  • Reports
    • Ancillary Services
      • RRAS Providers Details
      • Monthly Reports
      • RRAS Instruction Summary
      • Half Year Feedback to CERC
    • FRAS Feedback Report
    • Daily Reports
    • Weekly Reports
    • Monthly Reports
    • Electricity Demand Pattern Analysis
    • Frequency Profile
    • System Reliability Indices
      • Daily
        • Angular Difference
        • VDI/TTC/ATC
      • Weekly
        • Angular Difference
        • VDI/TTC/ATC
      • Monthly
        • VDI/FDI/System Reliability
    • Grid Disturbances / Incidences
    • Telemetry Status
    • Payment Security Mechanism
      • Daily Reports
      • Weekly Reports
    • Renewable Energy Certificate(REC) Mechanism
    • Technical Papers
    • Five Minute Metering and Accounting in India
  • Scheduling
    • All India URS
    • Declared Capability
    • Entitlement
    • Drawal Schedule
    • Bhutan Injection Profile
    • IR Drawal Schedule
    • Changes in last revision
      • Stations
      • State
    • Implemented Schedule
      • Form A
      • Form B
      • Form c
      • IR Drawal
    • Losses
    • Open Access
      • Approvals
      • Schedules
    • Scheduling Application
  • Transmission Pricing
    • Notified Procedures
    • Downloads
    • Formats for Data Submission
    • POC Data
    • CERC Regulation
    • Transmission Losses
    • CERC Orders
    • Notification of Peak Block
    • Notification of Transmission Charges for the DICs
  • Publications
    • Published Reports
      • Solar Eclipse 21st June 2020_Analysis of its impact on Indian Power System-A Report
      • Solar Eclipse dated 21.06.20 likely impacts and preparedness – A report
      • Report on Flexibility Analysis of Thermal Generation for Renewable Integration in India
      • Report on Pan India Lights Off Event (9 PM 9 Minutes) on 5th April 2020
      • Solar Eclipse Analysis of its impact on Indian Power System – A report
      • Solar Eclipse Indian Power System likely impacts and preparedness- A Report
    • Operational Feedback
    • Published Papers
    • Consultation Papers
    • Analysis of Ramping Capability
    • Hydro Committee Report
    • India Renewable Integration Study Report
    • Reference Document on Weather Portal
    • Spinning Reserves
    • Other Reports
    • POSOCO Institution Building as ISO in India
  • HR
    • HR website
    • HRD
    • Rajbhasha
    • Internship
    • PPSA
    • Ex Employee Login
  • Useful Links
    • RLDCs
      • NRLDC
      • WRLDC
      • SRLDC
      • NERLDC
      • ERLDC
    • FOLD
    • PSDF
    • Vidyut Pravah
    • MoP
    • CERC
    • MNRE
    • Weather
    • E-Gazette
    • Finance Website
    • Vigilance
    • Disaster Management
    • Attendance Management
    • GO15
    • CVC PLEDGE
    • Weather Portal
  • Notices
  • Media
  • Careers
    • Openings (recruitment)
    • Engagement of Apprentices
    • Candidate Downloads
    • Notifications
  • COVID-19

Compliance

List of Contracts

S. No. Name of the work Contractor Name Area Unit No. of Employee(s) Engaged Total Wages Avg. Salary
1 House Keeping DE -PESTERCOMPANY Kolkata ERLDC 8 157561 12244
2 Gardening UDDYAN Kolkata ERLDC 2 20355 10598
3 Security Mrinal Kanti Basak Security Agency Kolkata ERLDC 23 490649 20829
4 Gun Man Security Suranjan Ghosh Security Agency Kolkata ERLDC 4 104618 19665
5 AC Plant SUVIDHA ENGINEERING Kolkata ERLDC 8 137602 17200
6 SECURITY M/s Basavaraj Gunjegai Security Agency, #26, 1st floor, Sai Pallozza,
Near Modern School, Ejipura,
Viveknagar Post
Bangalore-560047
SRLDC Office Premises SRLDC 19 4233792 222831.158
7 Up-Keep and Maintenance M/s Varuna Landscapes, #1 Marasandra Layput, Behind Yadalam Doops, Subramanyapura Post, Bengaluru-560061 SRLDC Office Premises SRLDC 8 1008331 126041.375
8 Housekeeping , gardening and Office Attendant Services in WRLDC M/s Tiptop Facility Services Pvt. Ltd. WRLDC Office Building WRLDC 4+1+1+2 = 8 122,874 9,006
9 Office Attendant, Receptionist M/s Garuda Security Services WRLDC Office Building WRLDC 2+1=3 41,492 13831
10 Security Guard/Supervisor M/s Security Guard Board, Mumbai & Thane Dist. WRLDC Office Building WRLDC 14=1 2768737 184582
11 AMC of PC/LAN M/s Pacific Technologies LLP WRLDC Office Building WRLDC 1 1145258 95438
12 Security Services M/s Colonel Shishupal Security Consultation & Services NERLDC NERLDC 10 175,505.00 17,550.00
13 Up keep of Office premises M/s Jerry Nongkhlaw NERLDC NERLDC 5 39,790.00 7,958.00
14 Upkeep of Transit camp and office maintenance M/s Jerry Nongkhlaw NERLDC NERLDC 7 79,022.00 11,289.00
15 Electrical Maintenance M/s Greta Solutions NERLDC NERLDC 1 12,740.00 12,740.00
16 Despatch and Reception M/s Greta Solutions NERLDC NERLDC 4 32,636.00 8,159.00
17 Providing of Car Eco travels NLDC NLDC 2 15,000 10,000
18 Providing of Car Orange Cab NLDC NLDC 1 15,000 10,000
19 Canteen works Sharda Services NLDC NLDC 2 38677 10,000
20 Office Mgt. Services M/s Ashirbad Housekeeping Pvt. Ltd. New Delhi NLDC 20 325520 16276
21 Housekeeping & Additional Manpower M/s Ashirbad Housekeeping Pvt. Ltd. New Delhi NRLDC 24 398966 16624
22 A/C Plant M/s Blue Star Ltd. New Delhi NRLDC 5 145177 29035
23 Horticulture M/s Bhawna Nursery New Delhi NRLDC 1  12650 12650
24 Control Room Vehicle M/s Raja Travels New Delhi NRLDC 1  66487 66487
25 IT Resident Engineer M/s Silica Infotech Private Ltd. New Delhi NRLDC 1  11970 11970
26 GM Vehicle Orange Cabs New Delhi NRLDC 1  81383 81383
27 Providing operation services for DG set, UPS, Batteries, AC & LT panels M/s S. R. Electricals SRLDC SRLDC 5 111552.82 22310
  • Awards
  • Tenders
  • RTI
  • Compliance
  • Site Map
  • Feedback & Grievances
  • Contact Us
  • LinkedIn
  • Twitter

Power System Operation Corporation Limited

B-9 (1st Floor), Qutab Institutional Area, Katwaria Sarai, New Delhi -110016

Copyright ©2017 POSOCO

WordPress Download Manager - Best Download Management Plugin

Disclaimer

Precautions have been taken by National Load Dispatch Center (NLDC) to upload the data/information and the uploaded data/information is believed to be accurate, reliable and complete. However, before relying on the information material, users are advised to ensure its accuracy, currency, completeness and relevance for their purposes, and, in this respect, NLDC shall not be responsible for any errors or omissions. All information is provided without warranty of any kind.

NLDC disclaims all express, implied, and statutory warranties of any kind to user and/or any third party, including warranties as to accuracy, timeliness, completeness, merchantability, or fitness for any particular purpose. NLDC have no liability in tort, contract, or otherwise to user and/or third party. Further, NLDC shall, under no circumstances, be liable to user, and/or any third party, for any lost profits or lost opportunity, indirect, special, consequential, incidental, or punitive damages whatsoever, even if NLDC has been advised of the possibility of such damages.

By visiting this site, the users confirm about their awareness and agreement to this disclaimer and associated terms referred elsewhere.