POSOCO_Final_Logo

POWER SYSTEM OPERATION CORPORATION LIMITED

(A Government of India Enterprise) CIN: U40105DL2009GOI188682

National Load Despatch Centre

IMS-Policy-2019OHSAS-18001-2007
Login | Intranet | Mail
  • English
  • हिन्दी
  • Home
  • About Us
    • Annual Reports
    • Board of Directors
    • Chief Vigilance Officer (CVO)
    • Code of Business Conduct and Ethics
      • Circular Code
    • Document Retention Policy
    • Functions of NLDC
    • Mission & Objectives
    • Origin
    • The Organization
    • MoU
      • MoU 2019-20
      • MoU 2018-19
      • MoU 2017-18
      • Corporate Plan
    • CSR
    • Photo / Video Gallery
  • Market
    • Ancillary Services
    • REC
    • DSM Rates
    • PAT Scheme
    • Registered Traders
    • Congestion Formats
      • Warning Notice (Format III)
      • Application of Charge Notice (Format IV)
      • Withdrawal Notice (Format V)
      • Statement of Congestion Charge (Format VI)
    • Congestion Monitoring
    • Market Information
    • Monthly ATC
      • Inter Country
      • Inter Regional
      • Intra Regional
    • Open Access
      • Bilateral
      • Collective
        • Day Ahead Market
        • Real Time Market
      • Documents
      • STU Charges
    • TTC / ATC Declaration by CTU
  • SCED
    • CERC Order
    • Detailed Procedure
    • Bank details
    • National SCED Settlement Statement
    • National SCED benefit sharing statement
    • National Statement of Compensation due to Part Load Operation on Account of SCED
    • Reconciliation
    • Interim Feedback Report of Pilot on SCED
    • Detailed Feedback Report on SCED Pilot – Jan 2020
  • Renewables
    • RE Framework Procedures
    • RE Curtailments
  • Reports
    • Ancillary Services
      • RRAS Providers Details
      • Monthly Reports
      • RRAS Instruction Summary
      • Half Year Feedback to CERC
    • FRAS Feedback Report
    • Daily Reports
    • Weekly Reports
    • Monthly Reports
    • Electricity Demand Pattern Analysis
    • Frequency Profile
    • System Reliability Indices
      • Daily
        • Angular Difference
        • VDI/TTC/ATC
      • Weekly
        • Angular Difference
        • VDI/TTC/ATC
      • Monthly
        • VDI/FDI/System Reliability
    • Grid Disturbances / Incidences
    • Telemetry Status
    • Payment Security Mechanism
      • Daily Reports
      • Weekly Reports
    • Renewable Energy Certificate(REC) Mechanism
    • Technical Papers
    • Five Minute Metering and Accounting in India
  • Scheduling
    • All India URS
    • Declared Capability
    • Entitlement
    • Drawal Schedule
    • Bhutan Injection Profile
    • IR Drawal Schedule
    • Changes in last revision
      • Stations
      • State
    • Implemented Schedule
      • Form A
      • Form B
      • Form c
      • IR Drawal
    • Losses
    • Open Access
      • Approvals
      • Schedules
    • Scheduling Application
  • Transmission Pricing
    • Notified Procedures
    • Downloads
    • Formats for Data Submission
    • POC Data
    • CERC Regulation
    • Transmission Losses
    • CERC Orders
    • Notification of Peak Block
    • Notification of Transmission Charges for the DICs
  • Publications
    • Published Reports
      • Solar Eclipse 21st June 2020_Analysis of its impact on Indian Power System-A Report
      • Solar Eclipse dated 21.06.20 likely impacts and preparedness – A report
      • Report on Flexibility Analysis of Thermal Generation for Renewable Integration in India
      • Report on Pan India Lights Off Event (9 PM 9 Minutes) on 5th April 2020
      • Solar Eclipse Analysis of its impact on Indian Power System – A report
      • Solar Eclipse Indian Power System likely impacts and preparedness- A Report
    • Operational Feedback
    • Published Papers
    • Consultation Papers
    • Analysis of Ramping Capability
    • Hydro Committee Report
    • India Renewable Integration Study Report
    • Reference Document on Weather Portal
    • Spinning Reserves
    • Other Reports
    • POSOCO Institution Building as ISO in India
  • HR
    • HR website
    • HRD
    • Rajbhasha
    • Internship
    • PPSA
    • Ex Employee Login
  • Useful Links
    • RLDCs
      • NRLDC
      • WRLDC
      • SRLDC
      • NERLDC
      • ERLDC
    • FOLD
    • PSDF
    • Vidyut Pravah
    • MoP
    • CERC
    • MNRE
    • Weather
    • E-Gazette
    • Finance Website
    • Vigilance
    • Disaster Management
    • Attendance Management
    • GO15
    • CVC PLEDGE
    • Weather Portal
  • Notices
  • Media
  • Careers
    • Openings (recruitment)
    • Engagement of Apprentices
    • Candidate Downloads
    • Notifications
  • COVID-19

Market Information

Title File Size File Date
ATC-TTC FEB 12 Revision for 18-21st Feb 12 Consolidated 86.13 KB 11-07-2016
NER ATC TTC for 22-23 feb 12 86.13 KB 11-07-2016
ATC_NLDC_Oct14_Rev11 132.88 KB 11-10-2014
Revision in ER-NR TTC for 26-11-12 due to outage of Balia-Barh DC 8.82 KB 06-05-2013
Revision in ER-NR TTC for 20-11-12 due to outage of Kahalgaon -Barh 1 9.85 KB 06-05-2013
NER-ER TTC revision – from 23rd -26th july due to 400kV Balipara Bongaigao 21.87 KB 06-05-2013
Revision in ER-SR TTC due to shutdown of Kolaghat-Kharaghpur-Barpada on 22n 18.45 KB 06-05-2013
Revision in WR-SR TTC on 08-07-12 due to SD of Ramagundam-N sagar 1 and 2 50.02 KB 06-05-2013
Urgent_revision_WR-NR_TTC-ATC 19.31 KB 06-05-2013
NER-ER TTC revision – 20-June to 27-June due to Balipara Bongaigaon SD 65.32 KB 06-05-2013
ER-NR TTC Rev 1 – 30-May to 23-June 2012 due to SD of 400kV Malda-Purnea DC 9.40 KB 06-05-2013
NER-ER TTC revision – 12-June to 27-June due to Balipara Bongaigaon SD 31.57 KB 06-05-2013
NER-ER TTC revision – 30-May to 23-june due to Malda-Purnea SD Rev_01 53.66 KB 06-05-2013
NER-ER TTC revision – 30-May to 23-june due to Malda-Purnea SD 42.36 KB 06-05-2013
ER-NR TTC revision – 30-may to 23-June 2012 due to SD of 400kV Malda-Purnea 19.71 KB 06-05-2013
NER-ER TTC revision – for 28 and 29-may 2012 due to postponement of malda p 35.31 KB 06-05-2013
ER-NER TTC revision due to SD of Balipara Bongaigaon and Malda-Purnea DC f 248.58 KB 06-05-2013
Revision of NER-ER TTC-ATC due to Withdrwal of Balipara-Bongaigaon sd on 25 63.98 KB 06-05-2013
Punjab Import Capability for May12 63.99 KB 06-05-2013
Revision of NER-ER TTC-ATC for 17 63.94 KB 06-05-2013
Revision in WR-NR ATC-TTC due to SD of Agra Gwalior 2 on 16-05-12 10.86 KB 06-05-2013
Revision of NER-ER TTC-ATC due to Shutdown of 400 kVBalipara-Bongaigaon SC 76.43 KB 06-05-2013
Revision in ER-NER ATC-TTCdue to revival of 400kV Bongaigaon Binaguri I 7.66 KB 06-05-2013
Urgent Market Information_Revesion in ER-NER TTC_12MAY2012 7.65 KB 06-05-2013
Revised TTC for ER-NER due to Tower collapse of 400kV Bongaigaon Binaguri DC 145.49 KB 06-05-2013
Revision in ER -NER ATC due to the SD extension of 220kV surusajai-Agia upt 404.67 KB 06-05-2013
Market Information – Revision in ER-NER ATC-TTC due to the SD of Bong-Binag 459.28 KB 06-05-2013
Market Information- TTC Revision in ER-NER Coridor due to SD of Binaguri-Bo 48.62 KB 06-05-2013
WR-SR TTC-ATC due to Bhadrawati pole sd 59.98 KB 06-05-2013
Revision of NER ATC TTC from 29th-31st MAR due to S-D of Balipara-Bongg II 90.93 KB 06-05-2013
Revision of NER ATC TTC for 13th MAR due to Restoration of Balipara-Bongg I 78.89 KB 06-05-2013
Revision of NER ATC TTC for 13th MAR due to S-D of Balipara-Bongg I 78.84 KB 06-05-2013
NER ATC-TTC Revision on 08and09 Mar due to cancellation of Bongaigaon-Balip 81.95 KB 06-05-2013
Revised TTC ATC of ER for 20 and 21 February due to SD of 400kv Kahalgaon M 52.02 KB 06-05-2013
ER-NR and ER-NER TTC FOR 01 to 03 Mar 12 due to Shutdown of Teesta Plant 52.81 KB 06-05-2013
Revised TTC ATC of NER on 28 February 12 due to all India strike 78.63 KB 06-05-2013
  • Awards
  • Tenders
  • RTI
  • Compliance
  • Site Map
  • Feedback & Grievances
  • Contact Us
  • LinkedIn
  • Twitter

Power System Operation Corporation Limited

B-9 (1st Floor), Qutab Institutional Area, Katwaria Sarai, New Delhi -110016

Copyright ©2017 POSOCO

WordPress Download Manager - Best Download Management Plugin

Disclaimer

Precautions have been taken by National Load Dispatch Center (NLDC) to upload the data/information and the uploaded data/information is believed to be accurate, reliable and complete. However, before relying on the information material, users are advised to ensure its accuracy, currency, completeness and relevance for their purposes, and, in this respect, NLDC shall not be responsible for any errors or omissions. All information is provided without warranty of any kind.

NLDC disclaims all express, implied, and statutory warranties of any kind to user and/or any third party, including warranties as to accuracy, timeliness, completeness, merchantability, or fitness for any particular purpose. NLDC have no liability in tort, contract, or otherwise to user and/or third party. Further, NLDC shall, under no circumstances, be liable to user, and/or any third party, for any lost profits or lost opportunity, indirect, special, consequential, incidental, or punitive damages whatsoever, even if NLDC has been advised of the possibility of such damages.

By visiting this site, the users confirm about their awareness and agreement to this disclaimer and associated terms referred elsewhere.