POSOCO_Final_Logo

POWER SYSTEM OPERATION CORPORATION LIMITED

(A Government of India Enterprise) CIN: U40105DL2009GOI188682

National Load Despatch Centre

IMS-Policy-2019OHSAS-18001-2007
Login | Intranet | Mail
  • English
  • हिन्दी
  • Home
  • About Us
    • Annual Reports
    • Board of Directors
    • Chief Vigilance Officer (CVO)
    • Code of Business Conduct and Ethics
      • Circular Code
    • Document Retention Policy
    • Functions of NLDC
    • Mission & Objectives
    • Origin
    • The Organization
    • MoU
      • MoU 2018-19
      • MoU 2017-18
      • Corporate Plan
    • CSR
    • Photo Gallery
  • Market
    • Ancillary Services
    • REC
    • DSM Rates
    • PAT Scheme
    • Registered Traders
    • Congestion Formats
      • Warning Notice (Format III)
      • Application of Charge Notice (Format IV)
      • Withdrawal Notice (Format V)
      • Statement of Congestion Charge (Format VI)
    • Congestion Monitoring
    • Market Information
    • Monthly ATC
      • Inter Country
      • Inter Regional
      • Intra Regional
    • Open Access
      • Bilateral
      • Collective
      • Documents
      • STU Charges
    • TTC / ATC Declaration by CTU
  • SCED
    • CERC Order
    • Detailed Procedure
    • Bank details
    • National SCED Settlement Statement
    • National SCED benefit sharing statement
    • National Statement of Compensation due to Part Load Operation on Account of SCED
    • Reconciliation
    • Interim Feedback Report of Pilot on SCED
  • Renewables
    • RE Framework Procedures
  • Reports
    • Ancillary Services
      • RRAS Providers Details
      • Monthly Reports
      • RRAS Instruction Summary
      • Half Year Feedback to CERC
    • FRAS Feedback Report
    • Daily Reports
    • Weekly Reports
    • Monthly Reports
    • Electricity Demand Pattern Analysis
    • Frequency Profile
    • System Reliability Indices
      • Daily
        • Angular Difference
        • VDI/TTC/ATC
      • Weekly
        • Angular Difference
        • VDI/TTC/ATC
      • Monthly
        • VDI/FDI/System Reliability
    • Grid Disturbances / Incidences
    • Telemetry Status
    • Payment Security Mechanism
      • Daily Reports
      • Weekly Reports
    • Renewable Energy Certificate(REC) Mechanism
  • Scheduling
    • All India URS
    • Declared Capability
    • Entitlement
    • Drawal Schedule
    • Bhutan Injection Profile
    • IR Drawal Schedule
    • Changes in last revision
      • Stations
      • State
    • Implemented Schedule
      • Form A
      • Form B
      • Form c
      • IR Drawal
    • Losses
    • Open Access
      • Approvals
      • Schedules
    • Scheduling Application
  • Transmission Pricing
    • Approved Procedures
    • Downloads
    • FAQs
    • Formats for Data Submission
    • POC Data
    • Regulation
    • Transmission Losses
    • PoC Orders
  • Publications
    • Solar Eclipse Indian Power System likely impacts and preparedness- A Report
    • Operational Feedback
    • Published Papers
    • Consultation Papers
    • Analysis of Ramping Capability
    • Hydro Committee Report
    • India Renewable Integration Study Report
    • Reference Document on Weather Portal
    • Spinning Reserves
    • Other Reports
  • HR
    • HR website
    • Rajbhasha
    • Internship
    • PPSA
    • Ex Employee Login
  • RLDCs
    • NRLDC
    • WRLDC
    • SRLDC
    • NERLDC
    • ERLDC
  • Weather Portal
  • Useful Links
    • FOLD
    • PSDF
    • Vidyut Pravah
    • MoP
    • CERC
    • MNRE
    • Weather
    • E-Gazette
    • Finance Website
    • Vigilance
    • Disaster Management
    • Attendance Management
    • GO15
    • CVC PLEDGE
  • Careers
    • Openings (recruitment)
    • Candidate Downloads
    • Notifications

Published Papers

S.No. Published Papers Year Place Where Published
1 Short Circuit Analysis for Power System_RCC_1983 1983 RCC Feedback Vol. VI No.12
2 Energy Conservation in Electrical Industry_ISE_1990 1990 Indian Society of Engineers,Chartered Institute of Managaement Accountants and Calcutta and Indian American Chamber of Commerce
3 Some Aspects of Improving Quality of Electricity Production_IEPQ_1990 1990 All India Seminar,Institute of Engineers,Calcutta
4 Energy Conservation by Electrical Load Management through Day Light Utilization_IEE_1991 1991 Energy Conservation on Electrical Industry Seminar,Institute of Engineers,Calcutta
5 Black Start of Power Grid_Indian Journal of Power & River Valley Development_1992 1992 Power-1992,Indian Journal of Power & river valley Development
6 Commercial Accounting Procedure of Inter State Power Transaction in Eastern Region_Vidyut Bharati_1994 1994 Vidhuyt Bharti Vol.XVINo.4
7 Wheeling Charges in Eastern Region_National Convention of Electrical Engineers_1994 1994 Xth National Convention of Electrical Engineers,Ptana
8 Improved Capacity Utilization by exchange of power between Eastern Region and Neighboring Regions_All India Seminar_1995 1995 All India Seminar,Institute of Engineers,Calcutta
9 Trial Operation of Chukha Unit as Synchronous Motor_Jornal Water and Energy International_1995 1995 Journal Water and Energy International Vol. 52 No.3
10 Win Win Option Through Partnership_FOSET_1995 1995 Energy prospective of ER & NER Conference by FOSET
11 Optimum Reactive Power Management in Eastern Region Network – Techno – Economic Aspect_Afro-Asian Countries_1996 1996 International Conference on Power Development in Afro-Asian Countries,Kathmandu
12 System Frequency and its Impact on Network Voltage – A Case Study_CPRI_1996 1996 National Symposium” Power System Instrumentationa and Control,CPRI,Banglore
13 Accounting of Transmission Loss in Power Pools – A Case Study of Eastern Region_IEE_1997 1997 Energy Audit Workshop,Institute of Engineers,Calcutta
14 Power Scenario in Eastern Region_National Seminar_1998 1998 “Operational Problems of Indian Power System” Seminar,IIT,Delhi
15 Trans-national Power Exchange – An Essay on Costs and Benefits_FIESCA_1998 1998 “Improving the Availability of Power in south Asia” Workshop, Dhaka, Bangladesh
16 Eastern Region Power Demand Scenario – A Forecast_GMPS_2000 2000 GMPS-2000,Calcutta
17 Eastern Region Power Demand Scenario – A Forecast_Indian Journal of Power & River Valley Development_2001 2001 Indian Journal of Power & river valley Development
18 Importance of Traction Supply in the Eastern Region Power System – A system operator’s view_IEEE_2001 2001 “Electrical Traction-the challenges and development in Indian Context”, Institute of Engineers,Calcutta
19 Rejuvenation of Inter State Lines in SR Grid and its Impact on Grid Operation and Management_CBIP_2002 2002 CBIP Seminar on “Grid Operation and Management”,Chennai
20 UI _ Realizing a collective vision through Non-Cooperation 2005 Workshop on Electricity Market in India & Learning from Developed Markets, India Habitat Centre, New Delhi, March 2005
21 A Novel Settlement or Arbitrage Scheme – Use of Asynchronous Inter-Regional Links in India_ICPSODR_2006 2006 ICPSODR,Deptt of Electrical Engg,ITBHU
22 Significance of UI Mechanism in the Indian Electricity Supply Industry _ ICPSODR_2006 2006 ICPSODR,Deptt of Electrical Engg,ITBHU
23 Transparency In PowerSystemOperation.pdf 2006 Condour-2006,An inhouse journal of POWERGRID Vigilance department
24 Visualization and Human Factors in Electric Power System Operation_ICPSODR_ITBHU_2006 2006 ICPSODR,Deptt of Electrical Engg,ITBHU
25 A Power System Operator’s Tribute to Power Systems Guru Charles Concordia 2007 TRANSICA POWERGRID
26 Frequency Response Characteristics of an interconnected power system – A case study of regional grids in India_2007 2007 6th International Conference on Sustainable development of Water and Energy Resourses-Needs and Challenges,Lucknow,UP
27 An Indian Experience of defense Against Blackouts and Restoration Mechanism Followed 2008 Power and Energy Society General Meeting – Conversion and Delivery of Electrical Energy in the 21st Century, 2008 IEEE
28 Application of Phase angle Measurement for real time Security monitoring of Indian Electric Power System – An Experience _ CIGRE_2008 2008 CIGRE
29 In Praise of Unscheduled Interchange 2008 TRANSICA POWERGRID
30 Power Exchange_Final_22_Jan_09 2009 –
31 Reactive Power & Freq_relationship 2009 International R &D Conference
32 Multiple Power Exchanges in India A case study_CIGRE_2010 2010 CIGRE 2010
33 Power_Exchanges_in_India_Candour_28_Sep_2010 2010 Condour-2010,An inhouse journal of POWERGRID Vigilance department
34 Renewable Energy Certification Mechanism in India_2010 2010 National Power System Conference
35 Indian_Electricity_Market_Paper_GridTech2011_Final 2011 Grid Tech 2011,Delhi
36 On the Progress of Renewable Energy Integration into Smart Grids in India 2012 Power and Energy Society General Meeting, 2012 IEEE
37 Application of IT to Power System Operation – –
38 Southern Region Power Demand Scenario – A Forecast –
39 Special System Protection Schemes in Southern Region Power System – A Case Study –
40 Transparency in Power Sector through ABT –
41 Utilization of Idling Capacity of Captive Power Plants – A Viable Alternative – –
42 Development of Power Market in India – –

 

  • Awards
  • Tenders
  • RTI
  • Compliance
  • Site Map
  • Feedback & Grievances
  • Contact Us
  • LinkedIn
  • Twitter

Power System Operation Corporation Limited

B-9 (1st Floor), Qutab Institutional Area, Katwaria Sarai, New Delhi -110016

Copyright ©2017 POSOCO

WordPress Download Manager - Best Download Management Plugin

Disclaimer

Precautions have been taken by National Load Dispatch Center (NLDC) to upload the data/information and the uploaded data/information is believed to be accurate, reliable and complete. However, before relying on the information material, users are advised to ensure its accuracy, currency, completeness and relevance for their purposes, and, in this respect, NLDC shall not be responsible for any errors or omissions. All information is provided without warranty of any kind.

NLDC disclaims all express, implied, and statutory warranties of any kind to user and/or any third party, including warranties as to accuracy, timeliness, completeness, merchantability, or fitness for any particular purpose. NLDC have no liability in tort, contract, or otherwise to user and/or third party. Further, NLDC shall, under no circumstances, be liable to user, and/or any third party, for any lost profits or lost opportunity, indirect, special, consequential, incidental, or punitive damages whatsoever, even if NLDC has been advised of the possibility of such damages.

By visiting this site, the users confirm about their awareness and agreement to this disclaimer and associated terms referred elsewhere.