G20 2023 logo     
IMS-PolicyOHSAS-18001-2007
Login | Intranet | Mail
  • English
  • हिन्दी
  • Home
  • About Us
    • Annual Reports
    • Annual Return
    • Board of Directors
    • Resignation
    • Terms and conditions of appointment of independent directors
    • Code of Business Conduct and Ethics
      • Circular code
    • Document Retention Policy
    • Functions of NLDC
    • Mission & Objectives
    • Origin
    • The Organization
    • MoU
      • MoU 2021-22
      • MoU 2020-21
      • MoU 2019-20
      • MoU 2018-19
      • MoU 2017-18
    • CSR
    • Vision 2030
  • Market
    • MoP order: Optimization of use of power generated/allocation of Central Generating Station
    • Procedure for Charging Altered (including modified/replaced/upgraded) Elements
    • First Time Charging Procedure for Power system Elements
    • Ancillary Services
    • REC
    • NOAR
    • DSM Rates
      • DSM Rate (Applicable up to 04.12.22)
      • Procedure for Normal Rate of Charges for Deviation
      • DSM Rate (Applicable from 05.12.22)
    • PAT Scheme
    • Registered Traders
    • Congestion Formats
      • Warning Notice (Format III)
      • Application of Charge Notice (Format IV)
      • Withdrawal Notice (Format V)
      • Statement of Congestion Charge (Format VI)
    • Congestion Monitoring
    • Market Information
    • Monthly ATC
      • Inter Country
      • Inter Regional
      • Intra Regional
    • Open Access
      • Bilateral
      • Collective
        • Day Ahead Market
        • Real Time Market
      • Documents – OA
      • STU Charges
    • TTC / ATC Declaration by CTU
    • Registration of trading licensee and Power Exchange
    • GOAR
  • LPSC
    • Action under LPSC Rules, 2022
    • LPSC Procedure
    • Important Communications
  • SCED
    • CERC Order
    • Detailed Procedure
    • Bank details
    • National SCED Settlement Statement
    • National SCED benefit sharing statement
    • National Statement of Compensation due to Part Load Operation on Account of SCED
    • Reconciliation
    • Interim Feedback Report Pilot on SCED
    • Detailed_Feedback_Report on SCED Pilot – Jan 2020
    • Detailed Feedback Report on SCED Pilot – Mar 2021
    • Detailed Feedback Report on SCED Pilot – Sep 2021
    • Detailed Feedback Report on SCED Pilot – Mar 2022
  • Renewable
    • RE Framework Procedures
    • RE Curtailments
  • Reports
    • Ancillary Services
      • RRAS Provider Details
      • Monthly Report
      • RRAS Instruction Summary
      • Half Year Feedback to CERC
    • Daily Report
    • Weekly Report
    • Monthly Report
    • Quarterly Operational Feedback
    • Daily Frequency Profile
    • System Reliability Index
      • Daily
        • Angular Difference
        • VDI/TTC/ATC
      • Weekly
        • Angular Difference
        • VDI/TTC/ATC
      • Monthly
        • VDI/FDI/System Reliability
    • Monthly Grid Disturbances/Incidence
    • Telemetry Status
      • NRLDC
      • WRLDC
      • SRLDC
      • ERLDC
      • NERLDC
    • Payment Security Mechanism
      • Daily Reports
      • Weekly Reports
      • Daily PSM Status
        • Interstate PSM Status
        • Intrastate PSM Status
    • Technical Papers
    • Other Reports
      • Report: FRAS Pilot Project Experience and Feedback
      • Electricity Demand Pattern Analysis
      • Renewable Energy Certificate (REC) Mechanism
      • Five Minute Metering and Accounting in India
    • FRC
    • Green Day Ahead Market Monthly Data
  • Scheduling
    • New Scheduling
    • Old Scheduling
      • All India URS
      • Declared Capacity
      • Eligibility
      • Withdrawal Schedule
      • Bhutan Injection Profile
      • IR Withdrawal Schedule
      • Changes in the past
        • Stations
        • State
      • Implemented Schedule
        • Form A
        • Form B
        • Form C
        • Inter Sectoral Withdrawal
      • Loss
      • Open Access
        • Open Access – Approvals
        • Open Access – Schedules
      • Scheduling Application
    • Demand Forecast
  • Transmission Pricing
    • Notified Procedures
    • Downloads
    • Formats for Data Submission
    • POC Data
    • CERC Regulation
    • Transmission Losses
    • CERC Orders
    • Notification of Peak Block
    • Notification of Transmission Charges for the DICs
  • Publications
    • Public Reports
      • Seasonality Analysis of Load Factor-Indian power system perspective
      • Solar Eclipse 21 June 2020_Analysis of its impact on the Indian Power System-A Report
      • Solar Eclipse of 21.06.20 Possible Effects and Preparation – A Report
      • Report on Flexibility Analysis of Thermal Generation for Renewable Integration in India
      • Report on Pan India Lights of Event (9 PM at 9 PM) on 5th April 2020
      • Solar Eclipse Analysis of its Impact on the Indian Power System – A Report
      • Solar Eclipse Indian Power System likely impacts and preparedness- A Report
    • Published Papers
    • Consultation Papers
    • Analysis of Ramping Capability
    • Hydro Committee Report
    • India Renewable Integration Study Report
    • Reference Document on Weather Portal
    • Spinning Reserves
    • Other Reports
    • Inertia Assessment in the Indian Power System
  • HR
    • HR website
    • HRD website
    • Jigyasa eLearning Portal
    • HRD Action Plan
    • Rajbhasha
    • Internship
    • POSOCO Power System Awards
    • Ex employee login
    • Legal
  • Useful Links
    • RLDC
      • NRLDC
      • WRLDC
      • SRLDC
      • NERLDC
      • ERLDC
    • Fold
    • PSDF
    • Vidyut Pravah
    • Ministry of Power
    • CERC
    • MNRE
    • Weather
    • E – Gazette
    • Finance Website
    • Vigilance
    • Disaster Management
    • Attendance Management
    • Property Return System
    • GO15
    • CVC PLEDGE
    • Weather Portal
  • Notice
  • Media
    • Photo / Video Gallery
  • Careers
    • Current Openings
    • Engagement of Apprentices
    • Candidate Downloads
  • Covid-19

Operational Feedback

National Load Despatch Center (NLDC) has been assigned with the responsibility to provide operation feedback for planning of the National Grid to the Central Electricity Authority and Central Transmission Utility as per clause 4(j) of NLDC Rules, 2005.

Clause 4(j) of NLDC rules: “Providing operational feedback for national grid planning to the Authority and Central Transmission Utility.”

Accordingly, quarterly feedback have been submitted by NLDC to the central planning agencies since April 2010.


Title File Size File Date
NLDC Operational Feedback_Oct_2022 31.80 MB 25-10-2022
NLDC Operational Feedback_July_2022 49.19 MB 25-07-2022
NLDC Operational Feedback_Apr_2022 55.07 MB 25-04-2022
NLDC Operational Feedback_Jan_2022 52.96 MB 25-01-2022
NLDC Operational Feedback_Oct_2021 42.92 MB 25-10-2021
NLDC Operational Feedback_July_2021 40.03 MB 23-07-2021
NLDC Operational Feedback_April_2021 29.84 MB 25-04-2021
NLDC Operational Feedback_Jan_2021 39.19 MB 25-01-2021
NLDC Operational Feedback_Oct_2020 31.20 MB 23-10-2020
NLDC Operational Feedback_Jul_2020 41.60 MB 25-07-2020
NLDC Operational Feedback_April_2020 35.74 MB 25-04-2020
NLDC Operational Feedback_January_2020 13.27 MB 25-01-2020
NLDC Operational Feedback_October_2019 28.72 MB 25-10-2019
NLDC Operational Feedback_July_2019 36.12 MB 25-07-2019
NLDC Operational Feedback_April_2019_Q4_Final 26.44 MB 25-04-2019
NLDC Operational Feedback_January_2019_Q3 34.95 MB 25-01-2019
NLDC Operational Feedback_October_2018_Q2 39.54 MB 25-10-2018
Addendum_NLDC Operational Feedback_July_2018_Q1_R0 2.88 MB 20-08-2018
NLDC Operational Feedback_July_2018_Q1_R0 27.41 MB 25-07-2018
NLDC Operational Feedback_April_2018_Q4_R0 24.43 MB 30-04-2018
NLDC Operational Feedback_January_2018_Q3 40.13 MB 21-01-2018
NLDC Operational Feedback_October_2017_Q2 28.04 MB 21-10-2017
NLDC Operational Feedback_July_2017_Q1 20.52 MB 21-07-2017
NLDC Operational Feedback_Apr_2017_Q4 14.38 MB 21-04-2017
NLDC Operational Feedback_Jan_2017_Q3_Final 11.04 MB 20-01-2017
NLDC Operational Feedback_Oct_2016_Q2_Final 10.27 MB 26-10-2016
NLDC Operational Feedback_July_2016_Q1_final 8.16 MB 21-07-2016
NLDC Operational Feedback_April_2016_Q4 9.07 MB 25-04-2016
NLDC_Operational_Feedback_January_2016_Q3_Final 9.78 MB 25-02-2016
Prioritization of Transmission Elements January 2016 473.44 KB 24-02-2016
NLDC Operational Feedback_October_2015_Q2 7.93 MB 30-10-2015
NLDC Operational Feedback_July_2015_Q1_final 5.99 MB 23-07-2015
Operational Feedback on Skewed Inter Regional Flows_Final 1.10 MB 10-07-2015
NLDC Operational Feedback_April_2015 4.53 MB 27-04-2015
nldc_feedback_31Mar2015 (3) 398.83 KB 01-04-2015
NLDC_Operational_Feedback_January 2015 14.56 MB 22-01-2015
NLDC_Operational_Feedback_October 2014 9.09 MB 25-11-2014
Report_Power System oscillations_India_POSOCO_Final 10.44 MB 17-09-2014
NLDC_Operational_Feedback_July 2014 13.12 MB 20-07-2014
Operational Feedback on near miss Incident_30th May 2014 8.12 MB 06-06-2014
NLDC_Operational_Feedback_April 2014 33.01 MB 19-04-2014
Prioritization of Transmission Elements_Feb 2014 395.50 KB 11-03-2014
NLDC_Operational Feedback_January 2014 27.63 MB 21-01-2014
SR SYNCHRISATION _COMMENTS_SRLDC_21Nov2013 1.92 MB 12-12-2013
nldc_25nov2013_ctu_sr_ttc_trm 304.09 KB 12-12-2013
Addendum_NLDC Operational Feedback_Oct 194.01 KB 25-10-2013
Operational Feedback_Oct 2013 17.88 MB 23-10-2013
Feedback on long line lenth of 400kV Meramundali-Jeypore 297.85 KB 18-10-2013
Operational Feedback_July 2013 11.39 MB 23-08-2013
Operational_Feedback_April 2013 3.86 MB 21-05-2013
Prioritization of Transmission Elements_Mar_2013 829.91 KB 21-05-2013
Operational Feedback_January13 5.74 MB 21-05-2013
Operational Feedback_October2012 6.04 MB 21-05-2013
Operational Feedback_July2012 6.74 MB 21-05-2013
Operational Feedback_April2012 2.82 MB 21-05-2013
Operation_Feedback_Punjab_Disturbance_5October2011 7.72 MB 21-05-2013
Operational_Feedback_14July2011 5.24 MB 21-05-2013
Operation_Feedback_5April2010 5.43 MB 21-05-2013
Synchrophasor Initiatives in India_Task Force Report_June 2012 14.11 MB 21-05-2013
NetworkStrengthening_ER_27Jan2009 1.13 MB 13-03-2013
Proposal_SVC_24June2010 954.42 KB 13-03-2013
TransferCapability_SR_29Oct2010 49.24 KB 13-03-2013
Prioritization_CongestionRemoval_19Nov2010 1.96 MB 13-03-2013
SystemPlanning_SPS_14July2011 296.02 KB 13-03-2013
Interaction_Market Operation with Planning_14July2011 272.58 KB 13-03-2013
Dedicated_lines_CTU_CEA_12Sep2011 395.48 KB 13-03-2013
Dedicated_lines_CERC_30Nov2011 895.16 KB 13-03-2013
Operational Feedback_Rajasthan Connectivity_4Jan2012 818.03 KB 13-03-2013
FEEDBACK OF NLDC REGD MUNDRA GENERATION POCKET 795.21 KB 13-03-2013
  • Awards
  • Tenders
  • RTI
  • Citizens Charter
  • Compliance
  • Site Map
  • Feedback & Grievances
  • Contact Us
  • Facebook
  • LinkedIn
  • Twitter

NCW Women's HelpLine  - 7827170170

Grid Controller of India limited

B-9 (1st Floor), Qutab Institutional Area, Katwaria Sarai, New Delhi -110016

Copyright ©2022 GRID-INDIA | Last updated on: 27-01-2023

WordPress Download Manager - Best Download Management Plugin

Flasher
  • GRID-INDIA invites comments/suggestions on the issue of increasing the frequency of REC (Renewable Energy Certificates) trading sessions on Power Exchanges from once in a month to once in a week.
  • CERC Directions in the interest of grid security, in pursuance of the provisions of the Electricity Act, 2003 and the provisions DSM Regulations, 2022
  • Detailed Procedure for Estimation of the Requirement of Secondary Reserve Ancillary Service (SRAS) and Tertiary Reserve Ancillary Service (TRAS) at Regional Level
  • Awardees of POSOCO Power System Awards (PPSA)-2023- Click here!
  • Extension of Last Date to 18th Dec 2022 for Stakeholder Feedback on Draft Procedure for Allocation of Transmission Corridor for GNA and T-GNA Transactions
  • Extension of Last Date to 9th Dec 2022 for Stakeholder Consultation on Draft Procedure for Allocation of Transmission Corridor for GNA and T-GNA Transactions
  • Public Consultation – Draft Procedure on Allocation of Transmission Corridor for Scheduling of GNA and T-GNA Transactions
  • Detailed-Procedures-for-implementation-of-REC-Mechanism-in-compliance-of-CERC_REC_Regulation-2022
Disclaimer

Precautions have been taken by National Load Dispatch Center (NLDC) to upload the data/information and the uploaded data/information is believed to be accurate, reliable and complete. However, before relying on the information material, users are advised to ensure its accuracy, currency, completeness and relevance for their purposes, and, in this respect, NLDC shall not be responsible for any errors or omissions. All information is provided without warranty of any kind.

NLDC disclaims all express, implied, and statutory warranties of any kind to user and/or any third party, including warranties as to accuracy, timeliness, completeness, merchantability, or fitness for any particular purpose. NLDC have no liability in tort, contract, or otherwise to user and/or third party. Further, NLDC shall, under no circumstances, be liable to user, and/or any third party, for any lost profits or lost opportunity, indirect, special, consequential, incidental, or punitive damages whatsoever, even if NLDC has been advised of the possibility of such damages.

By visiting this site, the users confirm about their awareness and agreement to this disclaimer and associated terms referred elsewhere.