G20 2023 logo     
IMS-PolicyOHSAS-18001-2007
Login | Intranet | Mail
  • English
  • हिन्दी
  • Home
  • About Us
    • Annual Reports
    • Annual Return
    • Board of Directors
    • Resignation
    • Terms and conditions of appointment of independent directors
    • Code of Business Conduct and Ethics
      • Circular code
    • Document Retention Policy
    • Functions of NLDC
    • Mission & Objectives
    • Origin
    • The Organization
    • MoU
      • MoU 2021-22
      • MoU 2020-21
      • MoU 2019-20
      • MoU 2018-19
      • MoU 2017-18
    • CSR
    • Vision 2030
  • Market
    • MoP order: Optimization of use of power generated/allocation of Central Generating Station
    • Procedure for Charging Altered (including modified/replaced/upgraded) Elements
    • First Time Charging Procedure for Power system Elements
    • Ancillary Services
    • REC
    • NOAR
    • DSM Rates
      • DSM Rate (Applicable up to 04.12.22)
      • Procedure for Normal Rate of Charges for Deviation
      • DSM Rate (Applicable from 05.12.22)
    • PAT Scheme
    • Registered Traders
    • Congestion Formats
      • Warning Notice (Format III)
      • Application of Charge Notice (Format IV)
      • Withdrawal Notice (Format V)
      • Statement of Congestion Charge (Format VI)
    • Congestion Monitoring
    • Market Information
    • Monthly ATC
      • Inter Country
      • Inter Regional
      • Intra Regional
    • Open Access
      • Bilateral
      • Collective
        • Day Ahead Market
        • Real Time Market
      • Documents – OA
      • STU Charges
    • TTC / ATC Declaration by CTU
    • Registration of trading licensee and Power Exchange
    • GOAR
  • LPSC
    • Action under LPSC Rules, 2022
    • LPSC Procedure
    • Important Communications
  • SCED
    • CERC Order
    • Detailed Procedure
    • Bank details
    • National SCED Settlement Statement
    • National SCED benefit sharing statement
    • National Statement of Compensation due to Part Load Operation on Account of SCED
    • Reconciliation
    • Interim Feedback Report Pilot on SCED
    • Detailed_Feedback_Report on SCED Pilot – Jan 2020
    • Detailed Feedback Report on SCED Pilot – Mar 2021
    • Detailed Feedback Report on SCED Pilot – Sep 2021
    • Detailed Feedback Report on SCED Pilot – Mar 2022
  • Renewable
    • RE Framework Procedures
    • RE Curtailments
  • Reports
    • Ancillary Services
      • RRAS Provider Details
      • Monthly Report
      • RRAS Instruction Summary
      • Half Year Feedback to CERC
    • Daily Report
    • Weekly Report
    • Monthly Report
    • Quarterly Operational Feedback
    • Daily Frequency Profile
    • System Reliability Index
      • Daily
        • Angular Difference
        • VDI/TTC/ATC
      • Weekly
        • Angular Difference
        • VDI/TTC/ATC
      • Monthly
        • VDI/FDI/System Reliability
    • Monthly Grid Disturbances/Incidence
    • Telemetry Status
      • NRLDC
      • WRLDC
      • SRLDC
      • ERLDC
      • NERLDC
    • Payment Security Mechanism
      • Daily Reports
      • Weekly Reports
      • Daily PSM Status
        • Interstate PSM Status
        • Intrastate PSM Status
    • Technical Papers
    • Other Reports
      • Report: FRAS Pilot Project Experience and Feedback
      • Electricity Demand Pattern Analysis
      • Renewable Energy Certificate (REC) Mechanism
      • Five Minute Metering and Accounting in India
    • FRC
    • Green Day Ahead Market Monthly Data
  • Scheduling
    • New Scheduling
    • Old Scheduling
      • All India URS
      • Declared Capacity
      • Eligibility
      • Withdrawal Schedule
      • Bhutan Injection Profile
      • IR Withdrawal Schedule
      • Changes in the past
        • Stations
        • State
      • Implemented Schedule
        • Form A
        • Form B
        • Form C
        • Inter Sectoral Withdrawal
      • Loss
      • Open Access
        • Open Access – Approvals
        • Open Access – Schedules
      • Scheduling Application
    • Demand Forecast
  • Transmission Pricing
    • Notified Procedures
    • Downloads
    • Formats for Data Submission
    • POC Data
    • CERC Regulation
    • Transmission Losses
    • CERC Orders
    • Notification of Peak Block
    • Notification of Transmission Charges for the DICs
  • Publications
    • Public Reports
      • Seasonality Analysis of Load Factor-Indian power system perspective
      • Solar Eclipse 21 June 2020_Analysis of its impact on the Indian Power System-A Report
      • Solar Eclipse of 21.06.20 Possible Effects and Preparation – A Report
      • Report on Flexibility Analysis of Thermal Generation for Renewable Integration in India
      • Report on Pan India Lights of Event (9 PM at 9 PM) on 5th April 2020
      • Solar Eclipse Analysis of its Impact on the Indian Power System – A Report
      • Solar Eclipse Indian Power System likely impacts and preparedness- A Report
    • Published Papers
    • Consultation Papers
    • Analysis of Ramping Capability
    • Hydro Committee Report
    • India Renewable Integration Study Report
    • Reference Document on Weather Portal
    • Spinning Reserves
    • Other Reports
    • Inertia Assessment in the Indian Power System
  • HR
    • HR website
    • HRD website
    • Jigyasa eLearning Portal
    • HRD Action Plan
    • Rajbhasha
    • Internship
    • POSOCO Power System Awards
    • Ex employee login
    • Legal
  • Useful Links
    • RLDC
      • NRLDC
      • WRLDC
      • SRLDC
      • NERLDC
      • ERLDC
    • Fold
    • PSDF
    • Vidyut Pravah
    • Ministry of Power
    • CERC
    • MNRE
    • Weather
    • E – Gazette
    • Finance Website
    • Vigilance
    • Disaster Management
    • Attendance Management
    • Property Return System
    • GO15
    • CVC PLEDGE
    • Weather Portal
  • Notice
  • Media
    • Photo / Video Gallery
  • Careers
    • Current Openings
    • Engagement of Apprentices
    • Candidate Downloads
  • Covid-19

Transmission Losses – 2011-12

Title File Size File Date
20120326_0401 73.28 KB 16-04-2013
20120319_0325 14.71 KB 16-04-2013
20120312_0318 250.61 KB 16-04-2013
20120305_0311 73.41 KB 16-04-2013
20120227_0304 73.54 KB 16-04-2013
20120220_0226 78.39 KB 16-04-2013
20120213_0219 127.03 KB 16-04-2013
20120206_0212 132.74 KB 16-04-2013
20120130_0205 73.41 KB 16-04-2013
20120123_0129 73.07 KB 16-04-2013
20120116_0122 73.09 KB 16-04-2013
20120109_0115 73.42 KB 16-04-2013
20120102_0108 73.22 KB 16-04-2013
20111226_0101 83.18 KB 16-04-2013
20111219_1225 77.57 KB 16-04-2013
20111212_1218 73.15 KB 16-04-2013
20111205_1211 72.78 KB 16-04-2013
20111128_1204 73.39 KB 16-04-2013
20111121_1127 14.71 KB 16-04-2013
20111114_1120 72.92 KB 16-04-2013
20111107_1113 72.05 KB 16-04-2013
20111031_1106 14.71 KB 16-04-2013
20111024_1030 75.16 KB 16-04-2013
20111017_1023 72.92 KB 16-04-2013
20111010_1016 75.34 KB 16-04-2013
20111003_1009 73.20 KB 16-04-2013
20110926_1002 14.71 KB 16-04-2013
20110919_0925 14.72 KB 16-04-2013
20110912_0918[1] 73.51 KB 16-04-2013
20110905_0911 73.22 KB 16-04-2013
20110829_0904 73.67 KB 16-04-2013
20110822_0828 72.82 KB 16-04-2013
20110815_0821 72.18 KB 16-04-2013
20110808_0814 72.50 KB 16-04-2013
20110801_0807 69.47 KB 16-04-2013
20110725_0731 306.15 KB 16-04-2013
20110718_0724 306.69 KB 16-04-2013
20110711_0717 305.89 KB 16-04-2013
20110704_0710 306.21 KB 16-04-2013
20110701_0703 306.06 KB 16-04-2013
20080602_20110630 152.88 KB 16-04-2013
  • Awards
  • Tenders
  • RTI
  • Citizens Charter
  • Compliance
  • Site Map
  • Feedback & Grievances
  • Contact Us
  • Facebook
  • LinkedIn
  • Twitter

NCW Women's HelpLine  - 7827170170

Grid Controller of India limited

B-9 (1st Floor), Qutab Institutional Area, Katwaria Sarai, New Delhi -110016

Copyright ©2022 GRID-INDIA | Last updated on: 03-02-2023

WordPress Download Manager - Best Download Management Plugin

Flasher
  • GRID-INDIA invites comments/suggestions on the issue of increasing the frequency of REC (Renewable Energy Certificates) trading sessions on Power Exchanges from once in a month to once in a week.
  • CERC Directions in the interest of grid security, in pursuance of the provisions of the Electricity Act, 2003 and the provisions DSM Regulations, 2022
  • Detailed Procedure for Estimation of the Requirement of Secondary Reserve Ancillary Service (SRAS) and Tertiary Reserve Ancillary Service (TRAS) at Regional Level
  • Awardees of POSOCO Power System Awards (PPSA)-2023- Click here!
  • Extension of Last Date to 18th Dec 2022 for Stakeholder Feedback on Draft Procedure for Allocation of Transmission Corridor for GNA and T-GNA Transactions
  • Extension of Last Date to 9th Dec 2022 for Stakeholder Consultation on Draft Procedure for Allocation of Transmission Corridor for GNA and T-GNA Transactions
  • Public Consultation – Draft Procedure on Allocation of Transmission Corridor for Scheduling of GNA and T-GNA Transactions
  • Detailed-Procedures-for-implementation-of-REC-Mechanism-in-compliance-of-CERC_REC_Regulation-2022
Disclaimer

Precautions have been taken by National Load Dispatch Center (NLDC) to upload the data/information and the uploaded data/information is believed to be accurate, reliable and complete. However, before relying on the information material, users are advised to ensure its accuracy, currency, completeness and relevance for their purposes, and, in this respect, NLDC shall not be responsible for any errors or omissions. All information is provided without warranty of any kind.

NLDC disclaims all express, implied, and statutory warranties of any kind to user and/or any third party, including warranties as to accuracy, timeliness, completeness, merchantability, or fitness for any particular purpose. NLDC have no liability in tort, contract, or otherwise to user and/or third party. Further, NLDC shall, under no circumstances, be liable to user, and/or any third party, for any lost profits or lost opportunity, indirect, special, consequential, incidental, or punitive damages whatsoever, even if NLDC has been advised of the possibility of such damages.

By visiting this site, the users confirm about their awareness and agreement to this disclaimer and associated terms referred elsewhere.