G20 2023 logo     
IMS-PolicyOHSAS-18001-2007
Login | Intranet | Mail
  • English
  • हिन्दी
  • Home
  • About Us
    • Annual Reports
    • Annual Return
    • Board of Directors
    • Resignation
    • Terms and conditions of appointment of independent directors
    • Code of Business Conduct and Ethics
      • Circular code
    • Document Retention Policy
    • Functions of NLDC
    • Mission & Objectives
    • Origin
    • The Organization
    • MoU
      • MoU 2021-22
      • MoU 2020-21
      • MoU 2019-20
      • MoU 2018-19
      • MoU 2017-18
    • CSR
    • Vision 2030
  • Market
    • MoP order: Optimization of use of power generated/allocation of Central Generating Station
    • Procedure for Charging Altered (including modified/replaced/upgraded) Elements
    • First Time Charging Procedure for Power system Elements
    • Ancillary Services
    • REC
    • NOAR
    • DSM Rates
      • DSM Rate (Applicable up to 04.12.22)
      • Procedure for Normal Rate of Charges for Deviation
      • DSM Rate (Applicable from 05.12.22)
    • PAT Scheme
    • Registered Traders
    • Congestion Formats
      • Warning Notice (Format III)
      • Application of Charge Notice (Format IV)
      • Withdrawal Notice (Format V)
      • Statement of Congestion Charge (Format VI)
    • Congestion Monitoring
    • Market Information
    • Monthly ATC
      • Inter Country
      • Inter Regional
      • Intra Regional
    • Open Access
      • Bilateral
      • Collective
        • Day Ahead Market
        • Real Time Market
      • Documents – OA
      • STU Charges
    • TTC / ATC Declaration by CTU
    • Registration of trading licensee and Power Exchange
    • GOAR
  • LPSC
    • Action under LPSC Rules, 2022
    • LPSC Procedure
    • Important Communications
  • SCED
    • CERC Order
    • Detailed Procedure
    • Bank details
    • National SCED Settlement Statement
    • National SCED benefit sharing statement
    • National Statement of Compensation due to Part Load Operation on Account of SCED
    • Reconciliation
    • Interim Feedback Report Pilot on SCED
    • Detailed_Feedback_Report on SCED Pilot – Jan 2020
    • Detailed Feedback Report on SCED Pilot – Mar 2021
    • Detailed Feedback Report on SCED Pilot – Sep 2021
    • Detailed Feedback Report on SCED Pilot – Mar 2022
  • Renewable
    • RE Framework Procedures
    • RE Curtailments
  • Reports
    • Ancillary Services
      • RRAS Provider Details
      • Monthly Report
      • RRAS Instruction Summary
      • Half Year Feedback to CERC
    • Daily Report
    • Weekly Report
    • Monthly Report
    • Quarterly Operational Feedback
    • Daily Frequency Profile
    • System Reliability Index
      • Daily
        • Angular Difference
        • VDI/TTC/ATC
      • Weekly
        • Angular Difference
        • VDI/TTC/ATC
      • Monthly
        • VDI/FDI/System Reliability
    • Monthly Grid Disturbances/Incidence
    • Telemetry Status
      • NRLDC
      • WRLDC
      • SRLDC
      • ERLDC
      • NERLDC
    • Payment Security Mechanism
      • Daily Reports
      • Weekly Reports
      • Daily PSM Status
        • Interstate PSM Status
        • Intrastate PSM Status
    • Technical Papers
    • Other Reports
      • Report: FRAS Pilot Project Experience and Feedback
      • Electricity Demand Pattern Analysis
      • Renewable Energy Certificate (REC) Mechanism
      • Five Minute Metering and Accounting in India
    • FRC
    • Green Day Ahead Market Monthly Data
  • Scheduling
    • New Scheduling
    • Old Scheduling
      • All India URS
      • Declared Capacity
      • Eligibility
      • Withdrawal Schedule
      • Bhutan Injection Profile
      • IR Withdrawal Schedule
      • Changes in the past
        • Stations
        • State
      • Implemented Schedule
        • Form A
        • Form B
        • Form C
        • Inter Sectoral Withdrawal
      • Loss
      • Open Access
        • Open Access – Approvals
        • Open Access – Schedules
      • Scheduling Application
    • Demand Forecast
  • Transmission Pricing
    • Notified Procedures
    • Downloads
    • Formats for Data Submission
    • POC Data
    • CERC Regulation
    • Transmission Losses
    • CERC Orders
    • Notification of Peak Block
    • Notification of Transmission Charges for the DICs
  • Publications
    • Public Reports
      • Seasonality Analysis of Load Factor-Indian power system perspective
      • Solar Eclipse 21 June 2020_Analysis of its impact on the Indian Power System-A Report
      • Solar Eclipse of 21.06.20 Possible Effects and Preparation – A Report
      • Report on Flexibility Analysis of Thermal Generation for Renewable Integration in India
      • Report on Pan India Lights of Event (9 PM at 9 PM) on 5th April 2020
      • Solar Eclipse Analysis of its Impact on the Indian Power System – A Report
      • Solar Eclipse Indian Power System likely impacts and preparedness- A Report
    • Published Papers
    • Consultation Papers
    • Analysis of Ramping Capability
    • Hydro Committee Report
    • India Renewable Integration Study Report
    • Reference Document on Weather Portal
    • Spinning Reserves
    • Other Reports
    • Inertia Assessment in the Indian Power System
  • HR
    • HR website
    • HRD website
    • Jigyasa eLearning Portal
    • HRD Action Plan
    • Rajbhasha
    • Internship
    • POSOCO Power System Awards
    • Ex employee login
    • Legal
  • Useful Links
    • RLDC
      • NRLDC
      • WRLDC
      • SRLDC
      • NERLDC
      • ERLDC
    • Fold
    • PSDF
    • Vidyut Pravah
    • Ministry of Power
    • CERC
    • MNRE
    • Weather
    • E – Gazette
    • Finance Website
    • Vigilance
    • Disaster Management
    • Attendance Management
    • Property Return System
    • GO15
    • CVC PLEDGE
    • Weather Portal
  • Notice
  • Media
    • Photo / Video Gallery
  • Careers
    • Current Openings
    • Engagement of Apprentices
    • Candidate Downloads
  • Covid-19

Transmission Losses – 2014-15

Title File Size File Date
20150330_0405 695.12 KB 28-03-2015
20150323_0329 649.91 KB 21-03-2015
20150316_0322 605.19 KB 14-03-2015
20150309_0315 560.31 KB 07-03-2015
20150302_0308 515.69 KB 28-02-2015
20150223_0301 469.99 KB 21-02-2015
20150216_0222 406.11 KB 14-02-2015
20150209_0215 361.87 KB 07-02-2015
20150202_0208 316.37 KB 31-01-2015
20150126_0201 244.60 KB 24-01-2015
20150119_0125 199.89 KB 17-01-2015
20150112_0118 135.94 KB 10-01-2015
20150105_0111 71.30 KB 03-01-2015
20141229_0104 826.47 KB 27-12-2014
20141222_1228 764.67 KB 20-12-2014
20141215_1221 721.18 KB 13-12-2014
20141208_1214 678.26 KB 06-12-2014
20141201_1207 635.24 KB 29-11-2014
20141124_1130 510.04 KB 22-11-2014
20141117_1123 447.53 KB 15-11-2014
20141110_1116 385.40 KB 08-11-2014
20141103_1109 307.38 KB 01-11-2014
20141027_1102 592.42 KB 25-10-2014
20141020_1026 548.96 KB 18-10-2014
20141013_1019 464.42 KB 11-10-2014
20141006_1012 401.56 KB 04-10-2014
20140929_1005 275.62 KB 27-09-2014
20140922_0928 991.99 KB 20-09-2014
20140915_0921 929.50 KB 13-09-2014
20140908_0914 831.54 KB 06-09-2014
20140901_0907 787.89 KB 30-08-2014
20140825_0831 744.52 KB 23-08-2014
20140818_0824 701.02 KB 16-08-2014
20140811_0817 656.75 KB 09-08-2014
20140804_0810 537.09 KB 02-08-2014
20140728_0803 449.79 KB 26-07-2014
20140721_0727 327.93 KB 19-07-2014
20140714_0720 210.14 KB 12-07-2014
20140707_0713 366.22 KB 05-07-2014
20140630_0706 587.69 KB 28-06-2014
20140623_0629 543.34 KB 21-06-2014
20140616_0622 445.61 KB 14-06-2014
20140609_0615 374.16 KB 07-06-2014
20140602_0608 277.11 KB 31-05-2014
20140526_0601 671.43 KB 25-05-2014
20140519_0525 342.67 KB 17-05-2014
20140512_0518 279.13 KB 10-05-2014
20140505_0511 700.39 KB 03-05-2014
20140428_0504 638.13 KB 26-04-2014
20140421_0427 575.36 KB 19-04-2014
20140414_0420 478.10 KB 12-04-2014
20140407_0413 414.92 KB 05-04-2014
20140331_0406 352.23 KB 29-03-2014
  • Awards
  • Tenders
  • RTI
  • Citizens Charter
  • Compliance
  • Site Map
  • Feedback & Grievances
  • Contact Us
  • Facebook
  • LinkedIn
  • Twitter

NCW Women's HelpLine  - 7827170170

Grid Controller of India limited

B-9 (1st Floor), Qutab Institutional Area, Katwaria Sarai, New Delhi -110016

Copyright ©2022 GRID-INDIA | Last updated on: 03-02-2023

WordPress Download Manager - Best Download Management Plugin

Flasher
  • GRID-INDIA invites comments/suggestions on the issue of increasing the frequency of REC (Renewable Energy Certificates) trading sessions on Power Exchanges from once in a month to once in a week.
  • CERC Directions in the interest of grid security, in pursuance of the provisions of the Electricity Act, 2003 and the provisions DSM Regulations, 2022
  • Detailed Procedure for Estimation of the Requirement of Secondary Reserve Ancillary Service (SRAS) and Tertiary Reserve Ancillary Service (TRAS) at Regional Level
  • Awardees of POSOCO Power System Awards (PPSA)-2023- Click here!
  • Extension of Last Date to 18th Dec 2022 for Stakeholder Feedback on Draft Procedure for Allocation of Transmission Corridor for GNA and T-GNA Transactions
  • Extension of Last Date to 9th Dec 2022 for Stakeholder Consultation on Draft Procedure for Allocation of Transmission Corridor for GNA and T-GNA Transactions
  • Public Consultation – Draft Procedure on Allocation of Transmission Corridor for Scheduling of GNA and T-GNA Transactions
  • Detailed-Procedures-for-implementation-of-REC-Mechanism-in-compliance-of-CERC_REC_Regulation-2022
Disclaimer

Precautions have been taken by National Load Dispatch Center (NLDC) to upload the data/information and the uploaded data/information is believed to be accurate, reliable and complete. However, before relying on the information material, users are advised to ensure its accuracy, currency, completeness and relevance for their purposes, and, in this respect, NLDC shall not be responsible for any errors or omissions. All information is provided without warranty of any kind.

NLDC disclaims all express, implied, and statutory warranties of any kind to user and/or any third party, including warranties as to accuracy, timeliness, completeness, merchantability, or fitness for any particular purpose. NLDC have no liability in tort, contract, or otherwise to user and/or third party. Further, NLDC shall, under no circumstances, be liable to user, and/or any third party, for any lost profits or lost opportunity, indirect, special, consequential, incidental, or punitive damages whatsoever, even if NLDC has been advised of the possibility of such damages.

By visiting this site, the users confirm about their awareness and agreement to this disclaimer and associated terms referred elsewhere.