G20 2023 logo     
IMS-PolicyOHSAS-18001-2007
Login | Intranet | Mail
  • English
  • हिन्दी
  • Home
  • About Us
    • Annual Reports
    • Annual Return
    • Board of Directors
    • Resignation
    • Terms and conditions of appointment of independent directors
    • Code of Business Conduct and Ethics
      • Circular code
    • Document Retention Policy
    • Functions of NLDC
    • Mission & Objectives
    • Origin
    • The Organization
    • MoU
      • MoU 2021-22
      • MoU 2020-21
      • MoU 2019-20
      • MoU 2018-19
      • MoU 2017-18
    • CSR
    • Vision 2030
  • Market
    • MoP order: Optimization of use of power generated/allocation of Central Generating Station
    • Procedure for Charging Altered (including modified/replaced/upgraded) Elements
    • First Time Charging Procedure for Power system Elements
    • Ancillary Services
    • REC
    • NOAR
    • DSM Rates
      • DSM Rate (Applicable up to 04.12.22)
      • Procedure for Normal Rate of Charges for Deviation
      • DSM Rate (Applicable from 05.12.22)
    • PAT Scheme
    • Registered Traders
    • Congestion Formats
      • Warning Notice (Format III)
      • Application of Charge Notice (Format IV)
      • Withdrawal Notice (Format V)
      • Statement of Congestion Charge (Format VI)
    • Congestion Monitoring
    • Market Information
    • Monthly ATC
      • Inter Country
      • Inter Regional
      • Intra Regional
    • Open Access
      • Bilateral
      • Collective
        • Day Ahead Market
        • Real Time Market
      • Documents – OA
      • STU Charges
    • TTC / ATC Declaration by CTU
    • Registration of trading licensee and Power Exchange
    • GOAR
  • LPSC
    • Action under LPSC Rules, 2022
    • LPSC Procedure
    • Important Communications
  • SCED
    • CERC Order
    • Detailed Procedure
    • Bank details
    • National SCED Settlement Statement
    • National SCED benefit sharing statement
    • National Statement of Compensation due to Part Load Operation on Account of SCED
    • Reconciliation
    • Interim Feedback Report Pilot on SCED
    • Detailed_Feedback_Report on SCED Pilot – Jan 2020
    • Detailed Feedback Report on SCED Pilot – Mar 2021
    • Detailed Feedback Report on SCED Pilot – Sep 2021
    • Detailed Feedback Report on SCED Pilot – Mar 2022
  • Renewable
    • RE Framework Procedures
    • RE Curtailments
  • Reports
    • Ancillary Services
      • RRAS Provider Details
      • Monthly Report
      • RRAS Instruction Summary
      • Half Year Feedback to CERC
    • Daily Report
    • Weekly Report
    • Monthly Report
    • Quarterly Operational Feedback
    • Daily Frequency Profile
    • System Reliability Index
      • Daily
        • Angular Difference
        • VDI/TTC/ATC
      • Weekly
        • Angular Difference
        • VDI/TTC/ATC
      • Monthly
        • VDI/FDI/System Reliability
    • Monthly Grid Disturbances/Incidence
    • Telemetry Status
      • NRLDC
      • WRLDC
      • SRLDC
      • ERLDC
      • NERLDC
    • Payment Security Mechanism
      • Daily Reports
      • Weekly Reports
      • Daily PSM Status
        • Interstate PSM Status
        • Intrastate PSM Status
    • Technical Papers
    • Other Reports
      • Report: FRAS Pilot Project Experience and Feedback
      • Electricity Demand Pattern Analysis
      • Renewable Energy Certificate (REC) Mechanism
      • Five Minute Metering and Accounting in India
    • FRC
    • Green Day Ahead Market Monthly Data
  • Scheduling
    • New Scheduling
    • Old Scheduling
      • All India URS
      • Declared Capacity
      • Eligibility
      • Withdrawal Schedule
      • Bhutan Injection Profile
      • IR Withdrawal Schedule
      • Changes in the past
        • Stations
        • State
      • Implemented Schedule
        • Form A
        • Form B
        • Form C
        • Inter Sectoral Withdrawal
      • Loss
      • Open Access
        • Open Access – Approvals
        • Open Access – Schedules
      • Scheduling Application
    • Demand Forecast
  • Transmission Pricing
    • Notified Procedures
    • Downloads
    • Formats for Data Submission
    • POC Data
    • CERC Regulation
    • Transmission Losses
    • CERC Orders
    • Notification of Peak Block
    • Notification of Transmission Charges for the DICs
  • Publications
    • Public Reports
      • Seasonality Analysis of Load Factor-Indian power system perspective
      • Solar Eclipse 21 June 2020_Analysis of its impact on the Indian Power System-A Report
      • Solar Eclipse of 21.06.20 Possible Effects and Preparation – A Report
      • Report on Flexibility Analysis of Thermal Generation for Renewable Integration in India
      • Report on Pan India Lights of Event (9 PM at 9 PM) on 5th April 2020
      • Solar Eclipse Analysis of its Impact on the Indian Power System – A Report
      • Solar Eclipse Indian Power System likely impacts and preparedness- A Report
    • Published Papers
    • Consultation Papers
    • Analysis of Ramping Capability
    • Hydro Committee Report
    • India Renewable Integration Study Report
    • Reference Document on Weather Portal
    • Spinning Reserves
    • Other Reports
    • Inertia Assessment in the Indian Power System
  • HR
    • HR website
    • HRD website
    • Jigyasa eLearning Portal
    • HRD Action Plan
    • Rajbhasha
    • Internship
    • POSOCO Power System Awards
    • Ex employee login
    • Legal
  • Useful Links
    • RLDC
      • NRLDC
      • WRLDC
      • SRLDC
      • NERLDC
      • ERLDC
    • Fold
    • PSDF
    • Vidyut Pravah
    • Ministry of Power
    • CERC
    • MNRE
    • Weather
    • E – Gazette
    • Finance Website
    • Vigilance
    • Disaster Management
    • Attendance Management
    • Property Return System
    • GO15
    • CVC PLEDGE
    • Weather Portal
  • Notice
  • Media
    • Photo / Video Gallery
  • Careers
    • Current Openings
    • Engagement of Apprentices
    • Candidate Downloads
  • Covid-19

Transmission Losses – 2015-16

Title File Size File Date
09.06.17_NLDC_PSP 1.23 MB 09-06-2017
20170206-0212 408.04 KB 04-02-2017
20160328-0403 72.19 KB 26-03-2016
20160321-0327 1.33 MB 23-03-2016
20160314-0320 606.48 KB 12-03-2016
20160313-0307 536.38 KB 05-03-2016
20160306-0229 536.74 KB 27-02-2016
20160222-0228 536.30 KB 22-02-2016
20160215_0221 182.12 KB 22-02-2016
20160208_0214 484.91 KB 22-02-2016
20160201_0207 416.09 KB 22-02-2016
20160125_0131 347.35 KB 22-02-2016
20160118_0124 278.38 KB 22-02-2016
20160111_0117 176.16 KB 22-02-2016
20160104_0110 536.17 KB 22-02-2016
20151228_0103 352.09 KB 22-02-2016
20151221_1227 603.58 KB 22-02-2016
20151214_1220 639.10 KB 22-02-2016
20151207_1213 570.64 KB 22-02-2016
20151130_1206 652.29 KB 22-02-2016
20151123_1129 573.01 KB 22-02-2016
20151116_1122 535.11 KB 22-02-2016
20151109_1115 536.98 KB 22-02-2016
20151102-1108 1.52 MB 01-11-2015
20151026_1101 1.37 MB 25-10-2015
20151019_1025 184.03 KB 17-10-2015
20151012_1018 96.64 KB 10-10-2015
20151005_1011 1.82 MB 03-10-2015
20150928_1004 1.27 MB 26-09-2015
20150921_0927 1.11 MB 19-09-2015
20150914_0920 1.14 MB 12-09-2015
20150907_0913 969.79 KB 05-09-2015
20150831_0906 952.15 KB 29-08-2015
20150824_0830 1.28 MB 22-08-2015
20150817_0823 1.21 MB 15-08-2015
20150810_0816 1.11 MB 08-08-2015
20150803_0809 1.04 MB 01-08-2015
20150727_0802 916.11 KB 25-07-2015
20150720_0726 924.49 KB 18-07-2015
20150713_0719 385.46 KB 11-07-2015
20150706_0712 340.12 KB 04-07-2015
20150629_0705 267.43 KB 27-06-2015
20150622_0628 221.65 KB 20-06-2015
20150615_0621 176.35 KB 13-06-2015
20150608_0614 131.07 KB 06-06-2015
20150601_0607 121.77 KB 30-05-2015
20150525_0531 65.48 KB 23-05-2015
20150518_0524 503.78 KB 16-05-2015
20150511_0517 440.87 KB 09-05-2015
20150504_0510 342.17 KB 02-05-2015
20150427_0503 297.22 KB 26-04-2015
20150420_0426 251.85 KB 18-04-2015
20150413_0419 178.49 KB 11-04-2015
20150406_0412 133.02 KB 04-04-2015
  • Awards
  • Tenders
  • RTI
  • Citizens Charter
  • Compliance
  • Site Map
  • Feedback & Grievances
  • Contact Us
  • Facebook
  • LinkedIn
  • Twitter

NCW Women's HelpLine  - 7827170170

Grid Controller of India limited

B-9 (1st Floor), Qutab Institutional Area, Katwaria Sarai, New Delhi -110016

Copyright ©2022 GRID-INDIA | Last updated on: 03-02-2023

WordPress Download Manager - Best Download Management Plugin

Flasher
  • GRID-INDIA invites comments/suggestions on the issue of increasing the frequency of REC (Renewable Energy Certificates) trading sessions on Power Exchanges from once in a month to once in a week.
  • CERC Directions in the interest of grid security, in pursuance of the provisions of the Electricity Act, 2003 and the provisions DSM Regulations, 2022
  • Detailed Procedure for Estimation of the Requirement of Secondary Reserve Ancillary Service (SRAS) and Tertiary Reserve Ancillary Service (TRAS) at Regional Level
  • Awardees of POSOCO Power System Awards (PPSA)-2023- Click here!
  • Extension of Last Date to 18th Dec 2022 for Stakeholder Feedback on Draft Procedure for Allocation of Transmission Corridor for GNA and T-GNA Transactions
  • Extension of Last Date to 9th Dec 2022 for Stakeholder Consultation on Draft Procedure for Allocation of Transmission Corridor for GNA and T-GNA Transactions
  • Public Consultation – Draft Procedure on Allocation of Transmission Corridor for Scheduling of GNA and T-GNA Transactions
  • Detailed-Procedures-for-implementation-of-REC-Mechanism-in-compliance-of-CERC_REC_Regulation-2022
Disclaimer

Precautions have been taken by National Load Dispatch Center (NLDC) to upload the data/information and the uploaded data/information is believed to be accurate, reliable and complete. However, before relying on the information material, users are advised to ensure its accuracy, currency, completeness and relevance for their purposes, and, in this respect, NLDC shall not be responsible for any errors or omissions. All information is provided without warranty of any kind.

NLDC disclaims all express, implied, and statutory warranties of any kind to user and/or any third party, including warranties as to accuracy, timeliness, completeness, merchantability, or fitness for any particular purpose. NLDC have no liability in tort, contract, or otherwise to user and/or third party. Further, NLDC shall, under no circumstances, be liable to user, and/or any third party, for any lost profits or lost opportunity, indirect, special, consequential, incidental, or punitive damages whatsoever, even if NLDC has been advised of the possibility of such damages.

By visiting this site, the users confirm about their awareness and agreement to this disclaimer and associated terms referred elsewhere.