G20 2023 logo     
IMS-PolicyOHSAS-18001-2007
Login | Intranet | Mail
  • English
  • हिन्दी
  • Home
  • About Us
    • Annual Reports
    • Annual Return
    • Board of Directors
    • Resignation
    • Terms and conditions of appointment of independent directors
    • Code of Business Conduct and Ethics
      • Circular code
    • Document Retention Policy
    • Functions of NLDC
    • Mission & Objectives
    • Origin
    • The Organization
    • MoU
      • MoU 2021-22
      • MoU 2020-21
      • MoU 2019-20
      • MoU 2018-19
      • MoU 2017-18
    • CSR
    • Vision 2030
  • Market
    • MoP order: Optimization of use of power generated/allocation of Central Generating Station
    • Procedure for Charging Altered (including modified/replaced/upgraded) Elements
    • First Time Charging Procedure for Power system Elements
    • Ancillary Services
    • REC
    • NOAR
    • DSM Rates
      • DSM Rate (Applicable up to 04.12.22)
      • Procedure for Normal Rate of Charges for Deviation
      • DSM Rate (Applicable from 05.12.22)
    • PAT Scheme
    • Registered Traders
    • Congestion Formats
      • Warning Notice (Format III)
      • Application of Charge Notice (Format IV)
      • Withdrawal Notice (Format V)
      • Statement of Congestion Charge (Format VI)
    • Congestion Monitoring
    • Market Information
    • Monthly ATC
      • Inter Country
      • Inter Regional
      • Intra Regional
    • Open Access
      • Bilateral
      • Collective
        • Day Ahead Market
        • Real Time Market
      • Documents – OA
      • STU Charges
    • TTC / ATC Declaration by CTU
    • Registration of trading licensee and Power Exchange
    • GOAR
  • LPSC
    • Action under LPSC Rules, 2022
    • LPSC Procedure
    • Important Communications
  • SCED
    • CERC Order
    • Detailed Procedure
    • Bank details
    • National SCED Settlement Statement
    • National SCED benefit sharing statement
    • National Statement of Compensation due to Part Load Operation on Account of SCED
    • Reconciliation
    • Interim Feedback Report Pilot on SCED
    • Detailed_Feedback_Report on SCED Pilot – Jan 2020
    • Detailed Feedback Report on SCED Pilot – Mar 2021
    • Detailed Feedback Report on SCED Pilot – Sep 2021
    • Detailed Feedback Report on SCED Pilot – Mar 2022
  • Renewable
    • RE Framework Procedures
    • RE Curtailments
  • Reports
    • Ancillary Services
      • RRAS Provider Details
      • Monthly Report
      • RRAS Instruction Summary
      • Half Year Feedback to CERC
    • Daily Report
    • Weekly Report
    • Monthly Report
    • Quarterly Operational Feedback
    • Daily Frequency Profile
    • System Reliability Index
      • Daily
        • Angular Difference
        • VDI/TTC/ATC
      • Weekly
        • Angular Difference
        • VDI/TTC/ATC
      • Monthly
        • VDI/FDI/System Reliability
    • Monthly Grid Disturbances/Incidence
    • Telemetry Status
      • NRLDC
      • WRLDC
      • SRLDC
      • ERLDC
      • NERLDC
    • Payment Security Mechanism
      • Daily Reports
      • Weekly Reports
      • Daily PSM Status
        • Interstate PSM Status
        • Intrastate PSM Status
    • Technical Papers
    • Other Reports
      • Report: FRAS Pilot Project Experience and Feedback
      • Electricity Demand Pattern Analysis
      • Renewable Energy Certificate (REC) Mechanism
      • Five Minute Metering and Accounting in India
    • FRC
    • Green Day Ahead Market Monthly Data
  • Scheduling
    • New Scheduling
    • Old Scheduling
      • All India URS
      • Declared Capacity
      • Eligibility
      • Withdrawal Schedule
      • Bhutan Injection Profile
      • IR Withdrawal Schedule
      • Changes in the past
        • Stations
        • State
      • Implemented Schedule
        • Form A
        • Form B
        • Form C
        • Inter Sectoral Withdrawal
      • Loss
      • Open Access
        • Open Access – Approvals
        • Open Access – Schedules
      • Scheduling Application
    • Demand Forecast
  • Transmission Pricing
    • Notified Procedures
    • Downloads
    • Formats for Data Submission
    • POC Data
    • CERC Regulation
    • Transmission Losses
    • CERC Orders
    • Notification of Peak Block
    • Notification of Transmission Charges for the DICs
  • Publications
    • Public Reports
      • Seasonality Analysis of Load Factor-Indian power system perspective
      • Solar Eclipse 21 June 2020_Analysis of its impact on the Indian Power System-A Report
      • Solar Eclipse of 21.06.20 Possible Effects and Preparation – A Report
      • Report on Flexibility Analysis of Thermal Generation for Renewable Integration in India
      • Report on Pan India Lights of Event (9 PM at 9 PM) on 5th April 2020
      • Solar Eclipse Analysis of its Impact on the Indian Power System – A Report
      • Solar Eclipse Indian Power System likely impacts and preparedness- A Report
    • Published Papers
    • Consultation Papers
    • Analysis of Ramping Capability
    • Hydro Committee Report
    • India Renewable Integration Study Report
    • Reference Document on Weather Portal
    • Spinning Reserves
    • Other Reports
    • Inertia Assessment in the Indian Power System
  • HR
    • HR website
    • HRD website
    • Jigyasa eLearning Portal
    • HRD Action Plan
    • Rajbhasha
    • Internship
    • POSOCO Power System Awards
    • Ex employee login
    • Legal
  • Useful Links
    • RLDC
      • NRLDC
      • WRLDC
      • SRLDC
      • NERLDC
      • ERLDC
    • Fold
    • PSDF
    • Vidyut Pravah
    • Ministry of Power
    • CERC
    • MNRE
    • Weather
    • E – Gazette
    • Finance Website
    • Vigilance
    • Disaster Management
    • Attendance Management
    • Property Return System
    • GO15
    • CVC PLEDGE
    • Weather Portal
  • Notice
  • Media
    • Photo / Video Gallery
  • Careers
    • Current Openings
    • Engagement of Apprentices
    • Candidate Downloads
  • Covid-19

Transmission Losses – 2016-17

Title File Size File Date
20170327-0402 369.91 KB 25-03-2017
20170320-0326 479.08 KB 18-03-2017
20170313-0319 279.81 KB 11-03-2017
20170306-0312 478.62 KB 04-03-2017
20170227-0305 667.93 KB 25-02-2017
20170220-0226 401.44 KB 18-02-2017
20170213-0219 616.57 KB 11-02-2017
20170206-0212 408.04 KB 04-02-2017
20170130-0205 391.31 KB 28-01-2017
20170123-0129 623.08 KB 21-01-2017
20170116-0122 551.59 KB 14-01-2017
20170109-0115 481.85 KB 07-01-2017
20170102-20170108 481.64 KB 31-12-2016
20161226-20170101 661.70 KB 24-12-2016
20161219-1225 593.01 KB 17-12-2016
14.12.16_NLDC_PSP 427.81 KB 14-12-2016
System Reliability Indices for 13.12.16 19.68 KB 14-12-2016
20161212-1218 509.56 KB 10-12-2016
All_India_Angular_spread-dated 041216 116.91 KB 05-12-2016
20161205-1211 509.64 KB 03-12-2016
All_India_Angular_spread-dated 02122016 104.00 KB 03-12-2016
20161128-1204 727.11 KB 26-11-2016
20161121-1127 659.94 KB 19-11-2016
20161114-1120 627.67 KB 12-11-2016
20161107-1113 745.42 KB 05-11-2016
20161031-1106 789.63 KB 30-10-2016
20161024-1030 670.69 KB 22-10-2016
20161003-1009_R1 633.55 KB 18-10-2016
20161017-1023 587.32 KB 15-10-2016
20161010-1016 384.50 KB 08-10-2016
20161003-1009 591.55 KB 01-10-2016
20160926-1002 523.26 KB 24-09-2016
20160919-0925 411.53 KB 17-09-2016
20160912-0918 409.10 KB 10-09-2016
20160905-0911 474.44 KB 03-09-2016
20160829-0904 368.09 KB 27-08-2016
20160822-0828 455.51 KB 20-08-2016
20160815-0821 504.49 KB 13-08-2016
20160808-0814 436.81 KB 06-08-2016
20160801-0807 367.38 KB 30-07-2016
20160725-0731 581.49 KB 23-07-2016
20160718-0724 511.38 KB 16-07-2016
20160711-0717 839.97 KB 09-07-2016
20160711-0717 839.97 KB 09-07-2016
20160704-0710 726.84 KB 02-07-2016
20160704-0710 726.84 KB 02-07-2016
20160627-0703 726.89 KB 25-06-2016
20160627-0703 726.89 KB 25-06-2016
20160620-0626 725.87 KB 18-06-2016
20160620-0626 725.87 KB 18-06-2016
20160613-0619 655.06 KB 11-06-2016
20160613-0619 655.06 KB 11-06-2016
20160606-0612 547.67 KB 04-06-2016
20160606-0612 547.67 KB 04-06-2016
20160530-0605 807.26 KB 28-05-2016
20160530-0605 807.26 KB 28-05-2016
20160523-0529 640.13 KB 21-05-2016
20160523-0529 640.13 KB 21-05-2016
20160516-0522 629.93 KB 14-05-2016
20160516-0522 629.93 KB 14-05-2016
20160509-0515 560.83 KB 07-05-2016
20160509-0515 560.83 KB 07-05-2016
20160502-0508 424.79 KB 30-04-2016
20160502-0508 424.79 KB 30-04-2016
20160425-0501 355.64 KB 23-04-2016
20160425-0501 355.64 KB 23-04-2016
20160418-0424 290.59 KB 16-04-2016
20160418-0424 290.59 KB 16-04-2016
20160411-0417 205.90 KB 09-04-2016
20160411-0417 205.90 KB 09-04-2016
20160404-0410 121.75 KB 03-04-2016
20160404-0410 121.75 KB 03-04-2016
  • Awards
  • Tenders
  • RTI
  • Citizens Charter
  • Compliance
  • Site Map
  • Feedback & Grievances
  • Contact Us
  • Facebook
  • LinkedIn
  • Twitter

NCW Women's HelpLine  - 7827170170

Grid Controller of India limited

B-9 (1st Floor), Qutab Institutional Area, Katwaria Sarai, New Delhi -110016

Copyright ©2022 GRID-INDIA | Last updated on: 03-02-2023

WordPress Download Manager - Best Download Management Plugin

Flasher
  • GRID-INDIA invites comments/suggestions on the issue of increasing the frequency of REC (Renewable Energy Certificates) trading sessions on Power Exchanges from once in a month to once in a week.
  • CERC Directions in the interest of grid security, in pursuance of the provisions of the Electricity Act, 2003 and the provisions DSM Regulations, 2022
  • Detailed Procedure for Estimation of the Requirement of Secondary Reserve Ancillary Service (SRAS) and Tertiary Reserve Ancillary Service (TRAS) at Regional Level
  • Awardees of POSOCO Power System Awards (PPSA)-2023- Click here!
  • Extension of Last Date to 18th Dec 2022 for Stakeholder Feedback on Draft Procedure for Allocation of Transmission Corridor for GNA and T-GNA Transactions
  • Extension of Last Date to 9th Dec 2022 for Stakeholder Consultation on Draft Procedure for Allocation of Transmission Corridor for GNA and T-GNA Transactions
  • Public Consultation – Draft Procedure on Allocation of Transmission Corridor for Scheduling of GNA and T-GNA Transactions
  • Detailed-Procedures-for-implementation-of-REC-Mechanism-in-compliance-of-CERC_REC_Regulation-2022
Disclaimer

Precautions have been taken by National Load Dispatch Center (NLDC) to upload the data/information and the uploaded data/information is believed to be accurate, reliable and complete. However, before relying on the information material, users are advised to ensure its accuracy, currency, completeness and relevance for their purposes, and, in this respect, NLDC shall not be responsible for any errors or omissions. All information is provided without warranty of any kind.

NLDC disclaims all express, implied, and statutory warranties of any kind to user and/or any third party, including warranties as to accuracy, timeliness, completeness, merchantability, or fitness for any particular purpose. NLDC have no liability in tort, contract, or otherwise to user and/or third party. Further, NLDC shall, under no circumstances, be liable to user, and/or any third party, for any lost profits or lost opportunity, indirect, special, consequential, incidental, or punitive damages whatsoever, even if NLDC has been advised of the possibility of such damages.

By visiting this site, the users confirm about their awareness and agreement to this disclaimer and associated terms referred elsewhere.