POSOCO_Final_Logo

POWER SYSTEM OPERATION CORPORATION LIMITED

(A Government of India Enterprise) CIN: U40105DL2009GOI188682

National Load Despatch Centre

IMS-Policy-2019PAS-99-2012OHSAS-18001-2007
Login | Intranet | Mail
  • English
  • हिन्दी
  • Home
  • About Us
    • Annual Reports
    • Board of Directors
    • Chief Vigilance Officer (CVO)
    • Code of Business Conduct and Ethics
      • Circular Code
    • Functions of NLDC
    • Mission & Objectives
    • Origin
    • The Organization
    • MoU
      • MoU 2017-18
      • Corporate Plan
    • CSR
    • Photo Gallery
  • Market
    • Ancillary Services
    • REC
    • DSM Rates
    • PAT Scheme
    • Registered Traders
    • Congestion Formats
      • Warning Notice (Format III)
      • Application of Charge Notice (Format IV)
      • Withdrawal Notice (Format V)
      • Statement of Congestion Charge (Format VI)
    • Congestion Monitoring
    • Market Information
    • Monthly ATC
      • Inter Country
      • Inter Regional
      • Intra Regional
    • Open Access
      • Bilateral
      • Collective
      • Documents
      • STU Charges
    • TTC / ATC Declaration by CTU
  • Renewables
    • RE Framework Procedures
  • Reports
    • Ancillary Services
      • RRAS Providers Details
      • Monthly Reports
      • RRAS Instruction Summary
      • Half Year Feedback to CERC
    • Daily Reports
    • Weekly Reports
    • Monthly Reports
    • Other Reports
    • Hydro Committee Report
    • Reference Document on Weather Portal
    • Spinning Reserves
    • India Renewable Integration Study Report
    • Electricity Demand Pattern Analysis
    • Frequency Profile
    • System Reliability Indices
      • Daily
        • Angular Difference
        • VDI/TTC/ATC
      • Weekly
        • Angular Difference
        • VDI/TTC/ATC
      • Monthly
        • VDI/FDI/System Reliability
    • Grid Disturbances / Incidences
    • Telemetry Status
    • Renewable Energy Certificate(REC) Mechanism
  • Scheduling
    • All India URS
    • Declared Capability
    • Entitlement
    • Drawal Schedule
    • Bhutan Injection Profile
    • IR Drawal Schedule
    • Changes in last revision
      • Stations
      • State
    • Implemented Schedule
      • Form A
      • Form B
      • Form c
      • IR Drawal
    • Losses
    • Open Access
      • Approvals
      • Schedules
    • Scheduling Application
  • Transmission Pricing
    • Approved Procedures
    • Downloads
    • FAQs
    • Formats for Data Submission
    • POC Data
    • Regulation
    • Transmission Losses
    • PoC Orders
  • Documents
    • Operational Feedback
    • Published Papers
    • Consultation Papers
  • HR
    • HR website
    • Rajbhasha
    • Internship
    • PPSA
    • Ex Employee Login
  • RLDCs
    • NRLDC
    • WRLDC
    • SRLDC
    • NERLDC
    • ERLDC
  • Weather Portal
  • Useful Links
    • FOLD
    • PSDF
    • Vidyut Pravah
    • MoP
    • CERC
    • MNRE
    • Weather
    • E-Gazette
    • Finance Website
    • Vigilance
    • Disaster Management
    • Attendance Management
    • GO15
    • CVC PLEDGE
  • Careers
    • Openings (recruitment)
    • Candidate Downloads
    • Notifications

June 14, 2018 by Control Room

TTC-ATC Revision of WR-NR & NR Import wef 1200 hrs of 14.06.2018

TTC-ATC-Revision-of-WR-NR-NR-Import-wef-1200-hrs-of-14062018

Filed Under: News

  • Awards
  • Tenders
  • RTI
  • Compliance
  • Site Map
  • Feedback & Grievances
  • Contact Us
  • LinkedIn
  • Twitter

Power System Operation Corporation Limited

B-9 (1st Floor), Qutab Institutional Area, Katwaria Sarai, New Delhi -110016

Copyright ©2017 POSOCO

WordPress Download Manager - Best Download Management Plugin

Disclaimer

Precautions have been taken by National Load Dispatch Center (NLDC) to upload the data/information and the uploaded data/information is believed to be accurate, reliable and complete. However, before relying on the information material, users are advised to ensure its accuracy, currency, completeness and relevance for their purposes, and, in this respect, NLDC shall not be responsible for any errors or omissions. All information is provided without warranty of any kind.

NLDC disclaims all express, implied, and statutory warranties of any kind to user and/or any third party, including warranties as to accuracy, timeliness, completeness, merchantability, or fitness for any particular purpose. NLDC have no liability in tort, contract, or otherwise to user and/or third party. Further, NLDC shall, under no circumstances, be liable to user, and/or any third party, for any lost profits or lost opportunity, indirect, special, consequential, incidental, or punitive damages whatsoever, even if NLDC has been advised of the possibility of such damages.

By visiting this site, the users confirm about their awareness and agreement to this disclaimer and associated terms referred elsewhere.